12.12.2012 Views

Military Intelligence Professional Bulletin - Federation of American ...

Military Intelligence Professional Bulletin - Federation of American ...

Military Intelligence Professional Bulletin - Federation of American ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

56<br />

309 th MI Battalion soldiers training in the field.<br />

newly installed digital communication infrastructure gives the two courses at the three FTX sites, the ability to digitally<br />

communicate with each other and other 111 th MI Brigade courses.<br />

Sites Papa and Uniform are literally “across the street” from one another, but to connect the two sites approximately<br />

6,900 feet <strong>of</strong> fiber-optic data and 50-pair copper voice communications lines were required. The 6,900 feet <strong>of</strong> fiber-optic<br />

and 50-pair copper voice cable were installed in an aerial configuration, using existing power poles. An additional<br />

seven poles were installed expressly for aerial communications cabling. The installation was conducted by members<br />

11 th Signal Brigade soldiers installing aerial fiber optics.<br />

<strong>of</strong> the 504 th and the 69 th Signal Battalions, 11 th Signal Brigade in conjunction with the Sulphur Springs Valley Electric<br />

Cooperative (SSVEC). By performing the aerial installation, the Signal soldiers received real world training from experienced<br />

SSVEC linemen that will be invaluable during future real world deployments. The 309 th MI Battalion and the<br />

DTO benefited from a drastic reduction in installation costs estimated to be at least $70,000.<br />

To achieve data and voice connectivity from Site Uniform to the Fort Huachuca garrison, line-<strong>of</strong>-site microwave radios<br />

are employed. The microwave radio site is located above Site Uniform; the other end is located on the ro<strong>of</strong> <strong>of</strong><br />

Greely Hall, 5 to 6 miles away. To complete the connectivity between these sites, an aerial installation <strong>of</strong> fiber-optic<br />

cable was installed from the microwave radio site to an operations building located inside Site Uniform.<br />

<strong>Military</strong> <strong>Intelligence</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!