12.12.2012 Views

FM 3-19.4 - Army Electronic Publications & Forms - U.S. Army

FM 3-19.4 - Army Electronic Publications & Forms - U.S. Army

FM 3-19.4 - Army Electronic Publications & Forms - U.S. Army

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>FM</strong> 3-<strong>19.4</strong><br />

The size of the division forward collecting point and the placement of the<br />

internal facilities (the water point, the latrine, and trenches or covers) will<br />

vary based on the situation.<br />

Construction supplies<br />

Concertina<br />

Barbed wire<br />

Long and short pickets<br />

Staples and anchors<br />

Water cans<br />

L<br />

Not to scale<br />

Trench or cover<br />

Figure 7-1. Division Forward Collecting Point<br />

point. It can be anything from a guarded, roped off area<br />

to a secured, existing structure. The collecting point is<br />

built to suit the climate, the weather, and the situation.<br />

When selecting a collecting point, consider the following:<br />

• The security of the detainees. The perimeters of<br />

the enclosure must be clearly defined and<br />

understood by the detainees.<br />

7-6 Internment and Resettlement<br />

W<br />

W<br />

L<br />

Fighting<br />

position<br />

LEGEND<br />

Triple concertina<br />

Trench or cover<br />

Water cans or<br />

lyster bag<br />

Latrine

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!