06.05.2012 Views

AFG Arbonia-Forster-Holding AG Amriswilerstrasse 50

AFG Arbonia-Forster-Holding AG Amriswilerstrasse 50

AFG Arbonia-Forster-Holding AG Amriswilerstrasse 50

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

The future made of glass and steel<br />

The new <strong>AFG</strong> Corporate Center comprises offi ces with some 2<strong>50</strong> work places,<br />

a conference room, the restaurant «Arboneria», a bistro and various meeting, training and<br />

exhibition rooms. A vast parking garage is located in the three-leveled basement.<br />

Most of the building’s impressive<br />

exterior consists of a transparent<br />

glass front. Built to satisfy<br />

exigent requirements regarding interior<br />

climate, HVAC installations were chosen<br />

to match the highest standards. The <strong>AFG</strong><br />

Corporate Center thus is a new building<br />

equipped with cutting-edge technology.<br />

An energy concept based on a<br />

high level of engineering<br />

The HVAC systems were planned by Hälg<br />

Engineering. This demanding task was<br />

based on an energy concept for heating<br />

and cooling designed to realize an optimal<br />

10 | <strong>AFG</strong> Corporate Center<br />

ECONOMICAL AND ECOLOGICAL ENERGY GENERATION<br />

energy generation regarding effi ciency as<br />

well as economical aspects and ecological<br />

soundness. Cold and heat are generated<br />

using a monovalent reversible heat pump<br />

which picks up heat from the ground<br />

through geothermal probes to distribute it<br />

in the building. A separate cooling system<br />

with free cooling mode was installed for<br />

EDP cooling.<br />

Progressive HVAC technology<br />

Heating and cooling of rooms is effected<br />

via ventilation, ceiling cooling and fl oor<br />

convector systems as necessary. Offi ce<br />

rooms are air conditioned via hygiene<br />

The <strong>AFG</strong> Corporate Center –<br />

a new building equipped with<br />

cutting-edge technolgy.<br />

Efficient energy generation that is economical<br />

and at the same time ecologically sound.<br />

ventilation units with fresh air cooling systems.<br />

The remaining rooms are equipped<br />

with separate air conditioners. The complex<br />

HVAC facilities are controlled and<br />

adjusted via a building control system. ■<br />

Bruno Mannhart, Hälg + Co. <strong>AG</strong><br />

haelg@haelg.ch, www.haelg.ch, T +41 71 243 38 38

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!