06.05.2012 Views

AFG Arbonia-Forster-Holding AG Amriswilerstrasse 50

AFG Arbonia-Forster-Holding AG Amriswilerstrasse 50

AFG Arbonia-Forster-Holding AG Amriswilerstrasse 50

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

This computer vision, designed for the planning permission<br />

application, soon became reality.<br />

Planning with foresight<br />

and reacting fl exibly<br />

Our plans comprised two basement levels,<br />

one spacious fi rst fl oor and four upper<br />

fl oors, room for some 2<strong>50</strong> employees and<br />

200 underground car parking slots. From<br />

the outset, the building sponsor had a<br />

very clear concept: the surrounding area<br />

was not to be spoiled by a vast parking<br />

lot. An extra basement level comprising<br />

100 parking slots and the required technical<br />

facilities thus came as a last-minute<br />

addition to the plan. In retrospect, this<br />

proved to be one of the most important<br />

decisions initated by the building sponsor.<br />

In summer 2006, when the excavation of<br />

the site had started, the idea of integrating<br />

the company canteen «Arboneria»<br />

was approved. This comprised 1<strong>50</strong> seats<br />

plus infrastructure. The time left for the<br />

restaurant planner to act was short.<br />

6 | <strong>AFG</strong> Corporate Center<br />

A SYMBOL OF ECONOMIC AWAKENING<br />

However, the planner and his entire team<br />

rose to this challenge and delivered excellent<br />

results, showing once again that<br />

com petence and discipline can bring outstanding<br />

achievements. This input and<br />

these bids were in fact the basis for the<br />

subsequent awarding of the general<br />

con tractor’s contract. Following many<br />

negotiations and a successful bidding<br />

process, the general contractor was<br />

appointed in August 2006. The contract<br />

was awarded to Karl Steiner <strong>AG</strong>.<br />

Compliments and thanks<br />

The success of every business depends on<br />

committed individuals and their willingness<br />

to assume responsibility. Our thanks<br />

and compliments go out to Thomas<br />

Hüberli, head of the St.Gallen subsidiary,<br />

project manager Remo Fässler and construction<br />

site manager Roman Kuster,<br />

who was at times supported by four<br />

other site managers, of Karl Steiner <strong>AG</strong>.<br />

Their outstanding work was much appreciated.<br />

The planning team was still spearheaded<br />

by Dr. Edgar Oehler. The project<br />

got off to a good start, based also on the<br />

excellent cooperation between the general<br />

contractor, the planners, craftsmen and<br />

the sponsor throughout the entire construction<br />

period. Without this commitment,<br />

it would have been impossible to<br />

hand over the facilities in December 2007,<br />

after a construction period of only one<br />

and a half years. ■<br />

Christian Meng, Gisel + Partner <strong>AG</strong><br />

info@giselpartner.ch, www.giselpartner.ch,<br />

T +41 71 446 17 11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!