Nature <strong>of</strong> qualification, disclaimer,<br />
adverse opinion and matters <strong>of</strong><br />
non-compliance<br />
Qualified opinion<br />
For the selected programmes<br />
namely; corrections, security and<br />
social reintegration there were<br />
inadequacies for planned and<br />
reported targets, a large portion<br />
were not:<br />
• specific in clearly identifying the<br />
nature and the required level <strong>of</strong><br />
performance (24%);<br />
• measurable in identifying the<br />
required performance (30%);<br />
• time bound in specifying the time<br />
period or deadline for delivery<br />
(100%).<br />
Reliability <strong>of</strong> information<br />
Reported information had to be<br />
valid, accurate and complete, to<br />
ascertain that what is reported<br />
has actually occurred, is recorded<br />
correctly with no errors or<br />
omissions and all information<br />
had been included in the annual<br />
performance report.<br />
Auditor- General could not<br />
establish the validity and<br />
completeness <strong>of</strong> reported targets,<br />
as some correctional centres<br />
did not report performance<br />
information to management areas<br />
and some management areas<br />
did not report on all targets or<br />
reported information that was not<br />
relevant to the targets. In many<br />
cases, the information reported by<br />
management areas was different<br />
from the information in regional<br />
performance reports.<br />
At correctional centres, the validity<br />
<strong>of</strong> 43% <strong>of</strong> the reported targets for<br />
corrections, 50% for security and<br />
20% for social reintegration could<br />
not be established, as relevant<br />
source documentation could<br />
not be provided. At correctional<br />
centres, the completeness <strong>of</strong> 33%<br />
<strong>of</strong> the reported targets for the<br />
security programme could not be<br />
established, as relevant source<br />
documentation could not be<br />
provided.<br />
Department <strong>of</strong> Correctional Services - Vote 21<br />
Report <strong>of</strong> the Accounting Officer<br />
for the year ended 31 March 2012<br />
Financial year in which it first arose<br />
Progress made in clearing /<br />
resolving the matter<br />
2010/2011 Actions taken by department (what<br />
was done)<br />
During 2011/12 financial year 51<br />
technical indicator descriptors<br />
have been finalised out <strong>of</strong> the 91<br />
performance indicators in the<br />
department. Work sessions on<br />
source documents were held<br />
during 2011/12 with Heads <strong>of</strong><br />
Centres to ensure a common<br />
understanding <strong>of</strong> source<br />
documents and how it should serve<br />
as evidence for the next level <strong>of</strong><br />
reporting.<br />
The Department has further in<br />
2011/12 developed an APP data<br />
capturing tool to ensure capturing<br />
<strong>of</strong> data at Management Area per<br />
correctional centre. The Area<br />
Coordinators at Management<br />
Area level have been identified to<br />
do the capturing and they have<br />
been trained to that effect. The<br />
information per budget programme<br />
against the performance indicators<br />
in the APP had been captured with<br />
a clear trail <strong>of</strong> who captured the<br />
data and who verified the data.<br />
This process has already resulted<br />
in better quality reports in the 4th<br />
quarter <strong>of</strong> 2011/12 and the Annual<br />
Report for 2011/12 will be based<br />
on this process which will ensure<br />
an improvement in the reliability <strong>of</strong><br />
the information published. The APP<br />
data capturing tool also resulted in<br />
information being available more<br />
readily and it provided the Branch:<br />
Operations and Management<br />
Support with a monitoring<br />
ability over the certification and<br />
completeness <strong>of</strong> data capturing.<br />