<strong>atw</strong> Vol. 64 (2019) | Issue 5 ı May<br />
309<br />
Operating data<br />
Review period 2018<br />
REPORT<br />
Plant operator: EnBW Kernkraft GmbH (EnKK)<br />
Shareholder/Owner: EnBW Erneuerbare und Konventionelle<br />
Erzeugung AG (98.45 %), ZEAG Energie AG, Deutsche Bahn AG,<br />
Kernkraftwerk Obrigheim GmbH<br />
Plant name: Kernkraftwerk Philippsburg 2 (KKP 2)<br />
Address: EnBW Kernkraft GmbH, Kernkraftwerk Philippsburg,<br />
P.O. box 11 40, 76652 Philippsburg, Germany<br />
Phone: 07256 95-0, Telefax: 07256 95-2029<br />
E-mail: Poststelle-kkp@kk.enbw.com<br />
Web: www.enbw.com<br />
100<br />
90<br />
80<br />
70<br />
90<br />
Availability factor in %<br />
Capacity factor in %<br />
86<br />
73<br />
82<br />
90<br />
82<br />
90<br />
First synchronisation: 12-17-1984<br />
Date of commercial operation: 04-18-1985<br />
Design electrical rating (gross):<br />
1,468 MW<br />
Design electrical rating (net):<br />
1,402 MW<br />
Reactor type:<br />
PWR<br />
Supplier:<br />
Siemens/KWU<br />
60<br />
50<br />
40<br />
63<br />
The following operating results were achieved:<br />
Operating period, reactor:<br />
7,965 h<br />
Gross electrical energy generated in 2018: 10,993,639 MWh<br />
Net electrical energy generated in 2018: 10,323,151 MWh<br />
Gross electrical energy generated since<br />
first synchronisation until 12-31-2018:<br />
366,161,155 MWh<br />
Net electrical energy generated since<br />
first synchronisation until 12-31-2018:<br />
347,076,473 MWh<br />
Availability factor in 2018: 90.63 %<br />
Availability factor since<br />
date of commercial operation: 88.76 %<br />
Capacity factor 2018: 90.47 %<br />
Capacity factor since<br />
date of commercial operation: 88.49 %<br />
Downtime<br />
(schedule and <strong>for</strong>ced) in 2018: 9.37 %<br />
Number of reactor scrams 2018: 0<br />
30<br />
20<br />
10<br />
0<br />
10<br />
9<br />
8<br />
90<br />
2011<br />
86<br />
2012<br />
73<br />
2013<br />
82<br />
2014<br />
91<br />
2015<br />
82<br />
2016<br />
Collective radiation dose of own<br />
and outside personnel in Sv<br />
63<br />
2017<br />
91<br />
2018<br />
Licensed annual emission limits in 2018:<br />
Emission of noble gases with plant exhaust air: 1.1 · 10 15 Bq<br />
Emission of iodine-131 with plant exhaust air: 1.1 · 10 10 Bq<br />
Emission of nuclear fission and activation products<br />
with plant waste water (excluding tritium):<br />
5.5 · 10 10 Bq<br />
Proportion of licensed annual emission limits<br />
<strong>for</strong> radioactive materials in 2018 <strong>for</strong>:<br />
Emission of noble gases with plant exhaust air: 0.12 %<br />
Emission of iodine-131 with plant exhaust air: < limit of detection<br />
Emission of nuclear fission and activation products<br />
with plant waste water (excluding tritium): 0.04 %<br />
Collective dose:<br />
0.115 Sv<br />
7<br />
6<br />
5<br />
4<br />
3<br />
2<br />
1<br />
0<br />
0.14<br />
2011<br />
0.22<br />
2012<br />
0.16<br />
2013<br />
0.14<br />
2014<br />
0.15<br />
2015<br />
0.18<br />
2016<br />
0.07 0.12<br />
2017 2018<br />
Report<br />
Operating Results 2018