Operating data<br />

Review period 2018<br />

REPORT<br />

Plant operator: EnBW Kernkraft GmbH (EnKK)<br />

Shareholder/Owner: EnBW Erneuerbare und Konventionelle<br />

Erzeugung AG (98.45 %), ZEAG Energie AG, Deutsche Bahn AG,<br />

Kernkraftwerk Obrigheim GmbH<br />

Plant name: Kernkraftwerk Philippsburg 2 (KKP 2)<br />

Address: EnBW Kernkraft GmbH, Kernkraftwerk Philippsburg,<br />

P.O. box 11 40, 76652 Philippsburg, Germany<br />

Phone: 07256 95-0, Telefax: 07256 95-2029<br />

E-mail: Poststelle-kkp@kk.enbw.com<br />

Web: www.enbw.com<br />

100<br />

90<br />

80<br />

70<br />

90<br />

Availability factor in %<br />

Capacity factor in %<br />

86<br />

73<br />

82<br />

90<br />

82<br />

90<br />

First synchronisation: 12-17-1984<br />

Date of commercial operation: 04-18-1985<br />

Design electrical rating (gross):<br />

1,468 MW<br />

Design electrical rating (net):<br />

1,402 MW<br />

Reactor type:<br />

PWR<br />

Supplier:<br />

Siemens/KWU<br />

60<br />

50<br />

40<br />

63<br />

The following operating results were achieved:<br />

Operating period, reactor:<br />

7,965 h<br />

Gross electrical energy generated in 2018: 10,993,639 MWh<br />

Net electrical energy generated in 2018: 10,323,151 MWh<br />

Gross electrical energy generated since<br />

first synchronisation until 12-31-2018:<br />

366,161,155 MWh<br />

Net electrical energy generated since<br />

first synchronisation until 12-31-2018:<br />

347,076,473 MWh<br />

Availability factor in 2018: 90.63 %<br />

Availability factor since<br />

date of commercial operation: 88.76 %<br />

Capacity factor 2018: 90.47 %<br />

Capacity factor since<br />

date of commercial operation: 88.49 %<br />

Downtime<br />

(schedule and <strong>for</strong>ced) in 2018: 9.37 %<br />

Number of reactor scrams 2018: 0<br />

30<br />

20<br />

10<br />

0<br />

10<br />

9<br />

8<br />

90<br />

2011<br />

86<br />

2012<br />

73<br />

2013<br />

82<br />

2014<br />

91<br />

2015<br />

82<br />

2016<br />

Collective radiation dose of own<br />

and outside personnel in Sv<br />

63<br />

2017<br />

91<br />

2018<br />

Licensed annual emission limits in 2018:<br />

Emission of noble gases with plant exhaust air: 1.1 · 10 15 Bq<br />

Emission of iodine-131 with plant exhaust air: 1.1 · 10 10 Bq<br />

Emission of nuclear fission and activation products<br />

with plant waste water (excluding tritium):<br />

5.5 · 10 10 Bq<br />

Proportion of licensed annual emission limits<br />

<strong>for</strong> radioactive materials in 2018 <strong>for</strong>:<br />

Emission of noble gases with plant exhaust air: 0.12 %<br />

Emission of iodine-131 with plant exhaust air: < limit of detection<br />

Emission of nuclear fission and activation products<br />

with plant waste water (excluding tritium): 0.04 %<br />

Collective dose:<br />

0.115 Sv<br />

7<br />

6<br />

5<br />

4<br />

3<br />

2<br />

1<br />

0<br />

0.14<br />

2011<br />

0.22<br />

2012<br />

0.16<br />

2013<br />

0.14<br />

2014<br />

0.15<br />

2015<br />

0.18<br />

2016<br />

0.07 0.12<br />

2017 2018<br />

Report<br />

Operating Results 2018