Annual Report 2019
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
PATHS AND TRAILS<br />
The Community Council partnered with Okanogan Trail Construction to make<br />
extensive enhancements to the 35 miles of paths and trails in DC Ranch. The<br />
yearlong capital improvement project was substantially completed in <strong>2019</strong>.<br />
Improvements include an updated trail map; trail safety and connectivity<br />
recommendations; and a new wayfinding system that includes:<br />
• 70 posts with emergency markers<br />
• 192 directional signs<br />
• 3 kiosks and 3 pedestals with<br />
systemwide maps<br />
• 19 miles of paths (paved) and 16 miles of<br />
trails (dirt/granite)<br />
Safety improvements included slope stabilization, neighborhood ingress and<br />
egress and crosswalk enhancements in each of the four villages.<br />
In April, dozens of residents attended the Path and Trail Forum where they heard<br />
from the Okanogan team as well as trail experts from the City of Scottsdale and the<br />
McDowell Sonoran Conservancy to learn more about the path and trail system, the<br />
Preserve and hiking safety in and around DC Ranch.<br />
Upgrades to the path and trail system were a high priority<br />
for residents in the responses to the resident survey.<br />
8