30.03.2020 Views

Annual Report 2019

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

PATHS AND TRAILS<br />

The Community Council partnered with Okanogan Trail Construction to make<br />

extensive enhancements to the 35 miles of paths and trails in DC Ranch. The<br />

yearlong capital improvement project was substantially completed in <strong>2019</strong>.<br />

Improvements include an updated trail map; trail safety and connectivity<br />

recommendations; and a new wayfinding system that includes:<br />

• 70 posts with emergency markers<br />

• 192 directional signs<br />

• 3 kiosks and 3 pedestals with<br />

systemwide maps<br />

• 19 miles of paths (paved) and 16 miles of<br />

trails (dirt/granite)<br />

Safety improvements included slope stabilization, neighborhood ingress and<br />

egress and crosswalk enhancements in each of the four villages.<br />

In April, dozens of residents attended the Path and Trail Forum where they heard<br />

from the Okanogan team as well as trail experts from the City of Scottsdale and the<br />

McDowell Sonoran Conservancy to learn more about the path and trail system, the<br />

Preserve and hiking safety in and around DC Ranch.<br />

Upgrades to the path and trail system were a high priority<br />

for residents in the responses to the resident survey.<br />

8

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!