BEIJING 2007 PAUL ANDREU ARCHITECT<br />
Right in front of the Forbidden City and hidden under a gigantic titanium dome is the opera house. Construction<br />
had started and just as the project was entering its most interesting stage, LPA was commissioned to plan the<br />
public area lighting inside the dome. With all of the natural light filling the dome and complexity, the lighting<br />
environment needed special attention. During the design process we analyzed possible movements of visitor<br />
viewpoints throughout the dome and prioritized them into 12 categories for background luminance simulations.<br />
Unfortunately we were not commissioned to continue our work during the supervision phase and the result is<br />
not our intended lighting effect. Generally, this is a problem with most projects in China. Ideally, a consistent<br />
design office should be contracted all the way through to the end of the supervision phase.