You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
NEW ASSEMBLY CENTRE<br />
RUTHMANN INVESTS IN A NEW<br />
ASSEMBLY CENTRE IN GESCHER-HOCHMOOR<br />
The new assembly centre is being built at the Ruthmann headquarters in Gescher-Hochmoor on an<br />
area of around 4,200 m 2 , where the vehicles of the TB/TBR range as well as the T models of the 7.5 t<br />
range will be produced in the future.<br />
The former hall 2 from the seventies<br />
had to make way for the new<br />
building. During the construction<br />
phase, the production steps previously<br />
located there were reallocated<br />
to other parts of the plant.<br />
In the future, the new assembly<br />
centre will offer the employees a<br />
highly modern future-proof workplace<br />
with best ergonomics and<br />
space layout for greater efficiency.<br />
A sophisticated logistics concept<br />
contributes to this: From the material<br />
provision on an electrically<br />
driven tugger train with tractor<br />
and transport trolley to the routing<br />
and a well-thought-out transfer<br />
area concept. A sustainable waste<br />
disposal concept is as much a part<br />
of the new assembly centre as fast<br />
W-LAN communication.<br />
In the first stage, 35 employees will<br />
work in the new building. Ten additional<br />
workplaces will initially be<br />
created in order to meet the high<br />
demand for our STEIGER ® and to<br />
further reduce delivery times.<br />
A time lapse of<br />
the construction<br />
of the new assembly<br />
centre<br />
In a further step, ten additional<br />
workplaces will again be created<br />
probably by the end of 2022.<br />
| 39