28.06.2022 Views

vgbe energy journal 5 (2022) - International Journal for Generation and Storage of Electricity and Heat

vgbe energy journal - International Journal for Generation and Storage of Electricity and Heat. Issue 5 (2022). Technical Journal of the vgbe energy e.V. - Energy is us! NOTICE: Please feel free to read this free copy of the vgbe energy journal. This is our temporary contribution to support experience exchange in the energy industry during Corona times. The printed edition, subscription as well as further services are available on our website, www.vgbe.energy +++++++++++++++++++++++++++++++++++++++++++++++++++++++ Christopher Weßelmann: Editorial Nuclear power in numbers 2021/2022 Kernenergie in Zahlen 2021/2022 Peter Schluppkothen and Mats-Milan L. Müller: How the digital project twin changes plant engineering in power industry Der Digital Project Twin revolutioniert den Anlagenbau in der Energiewirtschaft Stefan Loubichi: Cyberwar in the energy industry: The current status Cyberwar in der Energiewirtschaft: der aktuelle Stand Antonio Ballesteros Avila and Miguel Peinador Veira: Operating experience from ageing events occurred at nuclear power plants Betriebserfahrungen mit Ereignissen in Bezug auf die Betriebszeit von Kernkraftwerken Minhee Kim, Junkyu Song and Kyungho Nam: Assessment of loss of shutdown cooling system accident during mid-loop operation in LSTF experiment using SPACE Code Bewertung des Ausfalls des Nachkühlsystems während des Mitte-Loop-Betriebs im LSTF-Experiment unter Verwendung des SPACE-Codes Jürgen Knorr and Albert Kerber: TRIPLE C waste container for increased long-term safety of HHGW disposal in salt, clay and crystalline TRIPLE C Abfallbehälter zur Erhöhung der Langzeitsicherheit der Einlagerung radioaktiver Abfälle in Salz, Ton und Kristallin Editorial: Nuclear power plants worldwide: Compact statistic 2021 Kernkraftwerke weltweit: Schnellstatistik 2021 vgbe energy: Operating experience with nuclear power plants 2021 Betriebserfahrungen mit Kernkraftwerken 2021 Paul Baruya: Power and coal prospects in developing Africa Trends der Stromerzeugung und des Kohleeinsatzes in den Entwicklungsländern Afrikas

vgbe energy journal - International Journal for Generation and Storage of Electricity and Heat.
Issue 5 (2022).
Technical Journal of the vgbe energy e.V. - Energy is us!
NOTICE: Please feel free to read this free copy of the vgbe energy journal. This is our temporary contribution to support experience exchange in the energy industry during Corona times. The printed edition, subscription as well as further services are available on our website, www.vgbe.energy
+++++++++++++++++++++++++++++++++++++++++++++++++++++++
Christopher Weßelmann: Editorial
Nuclear power in numbers 2021/2022
Kernenergie in Zahlen 2021/2022

Peter Schluppkothen and Mats-Milan L. Müller:
How the digital project twin changes plant engineering in power industry
Der Digital Project Twin revolutioniert den Anlagenbau in der Energiewirtschaft

Stefan Loubichi:
Cyberwar in the energy industry: The current status
Cyberwar in der Energiewirtschaft: der aktuelle Stand

Antonio Ballesteros Avila and Miguel Peinador Veira:
Operating experience from ageing events occurred at nuclear power plants
Betriebserfahrungen mit Ereignissen in Bezug auf die Betriebszeit von Kernkraftwerken

Minhee Kim, Junkyu Song and Kyungho Nam:
Assessment of loss of shutdown cooling system accident during mid-loop operation in LSTF experiment using SPACE Code
Bewertung des Ausfalls des Nachkühlsystems während des Mitte-Loop-Betriebs im LSTF-Experiment unter Verwendung des SPACE-Codes

Jürgen Knorr and Albert Kerber:
TRIPLE C waste container for increased long-term safety of HHGW disposal in salt, clay and crystalline
TRIPLE C Abfallbehälter zur Erhöhung der Langzeitsicherheit der Einlagerung radioaktiver Abfälle in Salz, Ton und Kristallin

Editorial:
Nuclear power plants worldwide: Compact statistic 2021
Kernkraftwerke weltweit: Schnellstatistik 2021

vgbe energy:
Operating experience with nuclear power plants 2021
Betriebserfahrungen mit Kernkraftwerken 2021

Paul Baruya:
Power and coal prospects in developing Africa
Trends der Stromerzeugung und des Kohleeinsatzes in den Entwicklungsländern Afrikas

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Members´News<br />

[1] Subject to the implementation <strong>of</strong> appropriate<br />

support policies <strong>and</strong> a regulatory framework<br />

conducive to the development <strong>of</strong> electrolytic<br />

hydrogen<br />

[2] Investments related to hydrogen production<br />

(excluding electricity production assets used to<br />

power the electrolysers)<br />

[3] The delegated act on climate objectives published<br />

in December 2021 by the European Union<br />

defines as “low carbon” hydrogen whose life cycle<br />

analysis emissions are less than 3 kg <strong>of</strong> CO-<br />

2eq/kg <strong>of</strong> H 2 produced. It should be noted that<br />

currently approximately 98% <strong>of</strong> hydrogen is<br />

produced from fossil fuels (methane, coal). The<br />

process there<strong>for</strong>e emits large amounts <strong>of</strong> CO 2 : to<br />

produce 1 kg <strong>of</strong> hydrogen, more than 10 kg <strong>of</strong><br />

CO 2 are emitted.<br />

LL<br />

www.edf.com (221600833)<br />

Premiere für die EEW-Gruppe: Erstes Feuer im Wirbelschicht <strong>of</strong>en einer<br />

Klärschlammverwertungsanlage − Inbetriebsetzung auf der Zielgeraden<br />

EDF Group: Hinkley Point C<br />

(edf) A review <strong>of</strong> the schedule <strong>and</strong> cost <strong>for</strong><br />

the two Hinkley Point C reactors has been<br />

finalised [1] <strong>and</strong> it has concluded:<br />

The start <strong>of</strong> electricity generation <strong>for</strong> Unit<br />

1 is targeted <strong>for</strong> June 2027, the risk <strong>of</strong> further<br />

delay <strong>of</strong> the two units is assessed at 15<br />

months, assuming the absence <strong>of</strong> a new p<strong>and</strong>emic<br />

wave <strong>and</strong> no additional effects <strong>of</strong> the<br />

war in Ukraine [2].<br />

The project completion costs are now estimated<br />

in the range <strong>of</strong> £ 25 Bn to £ 26 Bn<br />

(2015) [3]. Under the terms <strong>of</strong> the Contract<br />

<strong>for</strong> Difference, there is no impact <strong>for</strong> UK consumers.<br />

During more than two years <strong>of</strong> the Covid-19<br />

p<strong>and</strong>emic, the project continued without<br />

stopping. This protected the integrity <strong>of</strong><br />

the supply chain <strong>and</strong> allowed the completion<br />

<strong>of</strong> major milestones. However, people,<br />

resources <strong>and</strong> supply chain have been severely<br />

constrained <strong>and</strong> their efficiency has<br />

been restricted. In addition, the quantities <strong>of</strong><br />

materials <strong>and</strong> engineering as well as the cost<br />

<strong>of</strong> such activities, including, in particular<br />

marine works have risen.<br />

The next major milestone is the lifting <strong>of</strong><br />

the dome on Unit 1, <strong>for</strong>ecast <strong>for</strong> the second<br />

quarter <strong>of</strong> 2023.<br />

[1] The review took into account the main aspects<br />

<strong>of</strong> the project. The schedule <strong>and</strong> cost <strong>of</strong><br />

electromechanical works <strong>and</strong> <strong>of</strong> final testing<br />

have not been reviewed.<br />

[2] Since the beginning <strong>of</strong> construction, the<br />

project has been delayed by 18 months in total,<br />

mainly due to the Covid-19 p<strong>and</strong>emic. See the<br />

press release <strong>of</strong> January 27, 2021.<br />

[3] Costs net <strong>of</strong> operational action plans, in<br />

2015 sterling, excluding interim interest <strong>and</strong> at a<br />

reference exchange rate <strong>for</strong> the project <strong>of</strong> £1 =<br />

€1.23.<br />

LL<br />

www.edf.com (221600832)<br />

Premiere für die EEW-Gruppe:<br />

Erstes Feuer im Wirbelschicht<strong>of</strong>en<br />

einer Klärschlammverwertungsanlage<br />

− Inbetriebsetzung<br />

auf der Zielgeraden<br />

(eew) Die EEW Energy from Waste GmbH<br />

(EEW) hat Ende April erstmals die Brenner<br />

für das An- und Abfahren des Kessels gezündet<br />

und damit einen wichtigen Meilenstein<br />

für die weitere planmäßige Inbetriebsetzung<br />

der ersten Klärschlammverwertungsanlage<br />

(KVA) in der EEW-Gruppe erreicht.<br />

Die in Helmstedt entstehende Anlage ist auf<br />

eine Kapazität von 160.000 Tonnen Klärschlamm-Originalsubstanz<br />

(OS) ausgelegt<br />

und wird noch in <strong>2022</strong> einen umweltschonenden<br />

Verwertungsweg für ein Fünftel des<br />

niedersächsischen Klärschlamms eröffnen.<br />

„Ich bin stolz darauf, dass wir noch in diesem<br />

Jahr an unserem Stammsitz in Helmstedt<br />

die erste Klärschlammverwertungsanlage<br />

unserer Unternehmensgruppe in Betrieb<br />

nehmen werden“, sagt Bernard M.<br />

Kemper, Vorsitzender der Geschäftsführung<br />

von EEW. Ausgerüstet mit modernster Umweltschutztechnologie,<br />

nach den neuesten<br />

europäischen St<strong>and</strong>ards, werde sie einen<br />

echten Beitrag zum Klima-, Umwelt- und<br />

Ressourcenschutz leisten. „Mit unseren Anlagen<br />

schützen wir die Umwelt vor den<br />

schädlichen Auswirkungen der Klärschlammdüngung,<br />

recyceln lebensnotwendigen<br />

Phosphor und gewinnen umweltschonende<br />

Energie aus Abfall. Nachhaltigkeit<br />

und Kreislaufwirtschaft vereinen sich in einem<br />

ökologisch und ökonomisch zukunftweisenden<br />

Projekt“, ist CEO Bernard M.<br />

Kemper überzeugt.<br />

Für den Juni sei bereits das erste Klärschlammfeuer<br />

geplant und damit ein weiterer<br />

wichtiger Meilenstein in Sichtweite, sagt<br />

Projektleiter Helge Goedecke. Voraussetzung<br />

dafür sei das erfolgreiche Zünden des<br />

Ölbrenners gewesen. Er ist eine sicherheitsrelevante<br />

Anlagenkomponente, die nur<br />

nach Freigabe durch den TÜV betrieben<br />

werden darf. In der Inbetriebsetzungsphase<br />

ist das erste Ölfeuer Grundvoraussetzung<br />

für alle Folgeschritte, erklärt Helge Goedecke<br />

weiter. Der Brenner sei wichtig für das<br />

An- und Abfahren des Kessels, in dem der<br />

Klärschlamm bei mindestens 850 Grad Celsius<br />

energetisch verwertet wird. Der dabei<br />

entstehende Dampf werde auf die Turbine<br />

der benachbarten TRV geleitet und leiste so<br />

am traditionsreichen Energiest<strong>and</strong>ort<br />

Buschhaus einen Beitrag für die Stromversorgung<br />

der Region.<br />

Für Bernard M. Kemper ist die KVA vor diesem<br />

Hintergrund auch ein erstes sichtbares<br />

Zeichen des Strukturw<strong>and</strong>els im Helmstedter<br />

Revier nach dem Ende der Braunkohleverstromung<br />

und könne Ausgangspunkt für<br />

Folgenansiedlungen weiterer nachhaltiger<br />

Industrieprojekte sein.<br />

Die KVA Helmstedt ist Teil der EEW Energy<br />

from Waste-Gruppe. EEW Energy from Waste<br />

(EEW) ist ein in Europa führendes Unternehmen<br />

bei der Thermischen Abfall- und<br />

Klärschlammverwertung. Zur nachhaltigen<br />

energetischen Nutzung dieser Ressourcen<br />

entwickelt, errichtet und betreibt das Unternehmen<br />

Verwertungsanlagen auf höchstem<br />

technologischem Niveau und ist damit unabdingbarer<br />

Teil einer geschlossenen und<br />

nachhaltigen Kreislaufwirtschaft. In den<br />

derzeit 17 Anlagen der EEW-Gruppe in<br />

Deutschl<strong>and</strong> und im benachbarten Ausl<strong>and</strong><br />

tragen 1.250 Mitarbeiterinnen und Mitarbeiter<br />

für das energetische Recycling von<br />

jährlich bis zu 5 Millionen Tonnen Abfall<br />

Verantwortung. EEW w<strong>and</strong>elt die in den Abfällen<br />

enthaltene Energie und stellt diese als<br />

Prozessdampf für Industriebetriebe, Fernwärme<br />

für Wohngebiete sowie umweltschonenden<br />

Strom zur Verfügung. Durch diese<br />

energetische Verwertung der in den<br />

EEW-Anlagen eingesetzten Abfälle werden<br />

natürliche Ressourcen geschont, wertvolle<br />

Rohst<strong>of</strong>fe zurückgewonnen und die CO 2 -Bilanz<br />

entlastet.<br />

LL<br />

www.eew-<strong>energy</strong>fromwaste.com<br />

(221600830)<br />

10 | <strong>vgbe</strong> <strong>energy</strong> <strong>journal</strong> 5 · <strong>2022</strong>