04.06.2023 Views

MRP

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

primary principles

F46: Site 1 Proposal

7.3 | site 1: proposal

The proposed intervention includes a cycle

track with bollards that run under a tree

canopy on the eastern side of FM 2499.

Activation zones are located at large,

underutilised parking lots near commercial

big-box stores.

Activation area

The proposed route connects many of

Flower Mound’s existing trails, greatly

increasing connectivity and route choice

across the eastern part of the city.

existing

proposed

commuter routes

leisure routes

on-street bike lanes

fm 2499 | long prairie rd

fm 1171 | cross timbers rd

fm 3040 | flower mound rd

morriss rd

67

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!