04.06.2023 Views

MRP

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

F52: Site 4 Proposal

primary principles

7.6 | site 4: proposal

The proposed intervention includes a cycle

track with bollards that run under a tree

canopy within the median of Morriss Road.

The proposed route connects Flower

Mound’s eastern trailways with a solid

piece of direct bicycle infrastructure. This

route also ensures that large groupings of

residential areas located along the road

are served by adequate infrastructure.

Activation area

existing

proposed

commuter routes

leisure routes

on-street bike lanes

fm 2499 | long prairie rd

fm 1171 | cross timbers rd

fm 3040 | flower mound rd

morriss rd

73

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!