MRP
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
F52: Site 4 Proposal
primary principles
7.6 | site 4: proposal
The proposed intervention includes a cycle
track with bollards that run under a tree
canopy within the median of Morriss Road.
The proposed route connects Flower
Mound’s eastern trailways with a solid
piece of direct bicycle infrastructure. This
route also ensures that large groupings of
residential areas located along the road
are served by adequate infrastructure.
Activation area
existing
proposed
commuter routes
leisure routes
on-street bike lanes
fm 2499 | long prairie rd
fm 1171 | cross timbers rd
fm 3040 | flower mound rd
morriss rd
73