4 Final Report - Emits - ESA
4 Final Report - Emits - ESA
4 Final Report - Emits - ESA
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
4 <strong>Final</strong><br />
<strong>Report</strong><br />
4.6.1.1 High Level Functional Architecture<br />
At the first level of breakdown, the functional architecture identifies two main components:<br />
• The Flight Operations Segment (FOS),<br />
• The Payload Data Ground Segment (PDGS).<br />
This breakdown is illustrated and further refined in Figure 4.6-1.<br />
Mission Control<br />
System<br />
• Spacecraft Operational<br />
Database<br />
• Housekeeping Telemetry<br />
Processing<br />
• Time Management<br />
• Telecommand<br />
• Mission Planning<br />
• On-Board Software<br />
Maintenance<br />
• Ground Station Network<br />
Interface<br />
• Off-line analysis<br />
• Authentication and<br />
Encryption<br />
Facilities Ground Segment<br />
• Acquisition<br />
• Ingestion<br />
• Processing / reprocessing<br />
• Archiving and Inventory<br />
• Production Requests Handling<br />
• Dissemination<br />
• Circulation<br />
• Monitoring and Control<br />
FOS<br />
Flight Dynamics<br />
• Orbit Determination,<br />
Prediction and Control<br />
• AOCS Monitoring<br />
• AOCS Command<br />
Generation<br />
• Test and Validation<br />
Spacecraft Simulator<br />
• Platform Model<br />
• Payload Model<br />
• Ground Segment Model<br />
Ground Stations and<br />
Networks<br />
• TMTC Ground Stations<br />
• NDIU<br />
• PSS<br />
• Ground Communication<br />
Network<br />
User Services & Mission<br />
Planning<br />
• General Web<br />
• Catalogue<br />
• On-line Ordering and Order Handling<br />
• User Management<br />
• Mission Planning<br />
• Help and Documentation Desk<br />
• Statistics & <strong>Report</strong>ing<br />
PDGS<br />
Figure 4.6-1: Geo-Oculus -Ground Segment breakdown into Domains and Functions<br />
Sensor Performance, Products<br />
& Algorithms<br />
• Routine Quality Control<br />
• Product Quality Control<br />
• Product Calibration<br />
• Product Validation<br />
• Instrument Calibration<br />
• Processing and Instrument Data<br />
Files Generation<br />
• Instrument Performance Monitoring<br />
• Algorithms and Instrument<br />
Processing Facility Development<br />
• Instrument Processing Facility<br />
Maintenance & Evolution<br />
• User Support<br />
• Precise Orbit Determination<br />
4.6.1.2 Proposed Architecture<br />
In the following, the proposed overall architecture of the Geo-Oculus Ground Segment is presented.<br />
The single elements of the architecture will be considered in the subsequent subsections.<br />
The Geo-Oculus Ground Segment Architecture features:<br />
For Mission Monitoring and Control:<br />
• A Flight Operations Control Centre,<br />
• a nominal TM/TC station,<br />
• a back-up TM/TC station and<br />
• a network of additional TM/TC stations used only for LEOP.<br />
For Payload Data Reception, Exploitation and Processing:<br />
• A “core” Payload Data Ground Segment and<br />
Page 4-78 Doc. No: GOC-ASG-RP-002<br />
Issue: 2<br />
Astrium GmbH Date: 13.05.2009