01.01.2013 Views

Logano SK645/SK745 - Buderus

Logano SK645/SK745 - Buderus

Logano SK645/SK745 - Buderus

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

9.3 Installed dimensions<br />

A S<br />

A V<br />

Fig. 34 Installation room for <strong>Logano</strong> <strong>SK645</strong> and <strong>SK745</strong><br />

boilers<br />

1) For the <strong>SK745</strong> 1400 kW and 1850 kW, the control unit is<br />

mounted on the l.h. or r.h. side<br />

1)<br />

A H<br />

A S<br />

6 720 640 417-27.1il<br />

<strong>Logano</strong> Boiler size Clearance A H Clearance A V 1)<br />

<strong>SK645</strong><br />

<strong>SK745</strong><br />

1) Observe dimension L BR (burner length) relative to clearances A V and A S (on the closure side of the burner door)<br />

Installation location<br />

When installing your boiler maintain the<br />

recommended minimum dimensions. Select<br />

the recommended wall clearances to enable<br />

easy access for installation, maintenance and<br />

service work.<br />

Site the boiler only in rooms that comply with<br />

the local regulations appertaining to the<br />

siting of boilers. The room must be large<br />

enough to ensure access to the boiler in line<br />

with local regulations.<br />

Clearance A S<br />

[kW] [mm] [mm] [mm]<br />

120–300 1000 2000 250 + L BR<br />

360–600 1000 2100 250 + L BR<br />

730–1200 1000 2200 250 + L BR<br />

1400–1850 2)<br />

Tab. 21 Specified wall clearances<br />

2) Allow for an additional 230 mm on the side where the control unit is mounted.<br />

1000 2500 250 + L BR<br />

6 720 646 816 (10/2010) – Technical guide <strong>Logano</strong> <strong>SK645</strong> and <strong>SK745</strong> 51<br />

9

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!