4.3 Summary<br />
� An activity schedule is a method of presenting the activities of a<br />
project, which identifies their logical sequence and any<br />
dependencies that exist between them. It is also used as a means<br />
of identifying who will be responsible for implementing an<br />
activity.<br />
� Once the logframe itself is complete, it is then possible to copy<br />
the activities from the left-hand column into an activityscheduling<br />
format. The activity schedule provides preliminary<br />
estimates that will subsequently be revised by project<br />
management in the light of actual implementation performance.<br />
� With the activity schedule prepared, the job of further specifying<br />
inputs and scheduling costs can be started. Cost estimates must be<br />
based on careful and thorough budgeting. They will have<br />
significant influence over the investment decision at project<br />
appraisal and subsequently on the smooth implementation of the<br />
project if the go-ahead is given.<br />
� The list of activities should be copied into an input and cost<br />
schedule pro-forma. Each activity should then be used as a<br />
checklist to ensure that all necessary means under that activity are<br />
provided for.<br />