4.3 Summary<br />

� An activity schedule is a method of presenting the activities of a<br />

project, which identifies their logical sequence and any<br />

dependencies that exist between them. It is also used as a means<br />

of identifying who will be responsible for implementing an<br />

activity.<br />

� Once the logframe itself is complete, it is then possible to copy<br />

the activities from the left-hand column into an activityscheduling<br />

format. The activity schedule provides preliminary<br />

estimates that will subsequently be revised by project<br />

management in the light of actual implementation performance.<br />

� With the activity schedule prepared, the job of further specifying<br />

inputs and scheduling costs can be started. Cost estimates must be<br />

based on careful and thorough budgeting. They will have<br />

significant influence over the investment decision at project<br />

appraisal and subsequently on the smooth implementation of the<br />

project if the go-ahead is given.<br />

� The list of activities should be copied into an input and cost<br />

schedule pro-forma. Each activity should then be used as a<br />

checklist to ensure that all necessary means under that activity are<br />

provided for.<br />