50<br />
Step 1<br />
*NOTE: Pre-drill all holes for Lag Bolts with the appropriate drill bit. Use an 1/8" drill bit for<br />
pre-drilling holes for 5/16" Hardware (H108).<br />
*NOTE: Do not tighten hardware in #1 at this time.<br />
1. Lay Corner Uprights (169) (170) on the ground. Attach Top Joist w/Swing Holes (77) to Corner<br />
Uprights (170) using 3/8" Hardware (H3) (H<strong>11</strong>) (H17) (H56) and 1/2" Hardware (H4).<br />
*NOTE: 4 Hole Facias (50) must be flush with the bottoms and sides of Corner Uprights<br />
(169) (170), and they must be oriented as shown in Detail A.<br />
*NOTE: Corner Uprights (169) (170) should measure 52" from outside face to outside face<br />
when properly installed (as shown).<br />
*SUGGESTION: When installing Facias, install bottom lag bolts first, check that<br />
measurements are correct and assembly is square, then install top lag bolts.<br />
2. Attach 4 Hole Facias (50) to Corner Uprights (169) (170) using 1/4" Hardware (H1) and 5/16"<br />
Hardware (H108).<br />
3. Measure up 82 7/8" from the bottom of Corner Uprights (169) and attach 4 Hole Facia w/Rope<br />
Hole (52) to Corner Uprights (169) using 1/4" Hardware (H1) and 5/16" Hardware (H108). The<br />
Facia (52) must be oriented as shown in Detail B.<br />
1 1/4"<br />
52<br />
169 170<br />
DETAIL A<br />
169<br />
DETAIL B<br />
1 1/4"<br />
1 3/4"<br />
82 7/8"<br />
H108 H1<br />
Upright Assembly<br />
52<br />
50<br />
170<br />
169<br />
19<br />
52"<br />
77<br />
H56<br />
50<br />
H4<br />
H17<br />
H3<br />
H<strong>11</strong><br />
170