02.02.2013 Views

5pm cst SATURDAYS (April 11 - June 30)

5pm cst SATURDAYS (April 11 - June 30)

5pm cst SATURDAYS (April 11 - June 30)

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

50<br />

Step 1<br />

*NOTE: Pre-drill all holes for Lag Bolts with the appropriate drill bit. Use an 1/8" drill bit for<br />

pre-drilling holes for 5/16" Hardware (H108).<br />

*NOTE: Do not tighten hardware in #1 at this time.<br />

1. Lay Corner Uprights (169) (170) on the ground. Attach Top Joist w/Swing Holes (77) to Corner<br />

Uprights (170) using 3/8" Hardware (H3) (H<strong>11</strong>) (H17) (H56) and 1/2" Hardware (H4).<br />

*NOTE: 4 Hole Facias (50) must be flush with the bottoms and sides of Corner Uprights<br />

(169) (170), and they must be oriented as shown in Detail A.<br />

*NOTE: Corner Uprights (169) (170) should measure 52" from outside face to outside face<br />

when properly installed (as shown).<br />

*SUGGESTION: When installing Facias, install bottom lag bolts first, check that<br />

measurements are correct and assembly is square, then install top lag bolts.<br />

2. Attach 4 Hole Facias (50) to Corner Uprights (169) (170) using 1/4" Hardware (H1) and 5/16"<br />

Hardware (H108).<br />

3. Measure up 82 7/8" from the bottom of Corner Uprights (169) and attach 4 Hole Facia w/Rope<br />

Hole (52) to Corner Uprights (169) using 1/4" Hardware (H1) and 5/16" Hardware (H108). The<br />

Facia (52) must be oriented as shown in Detail B.<br />

1 1/4"<br />

52<br />

169 170<br />

DETAIL A<br />

169<br />

DETAIL B<br />

1 1/4"<br />

1 3/4"<br />

82 7/8"<br />

H108 H1<br />

Upright Assembly<br />

52<br />

50<br />

170<br />

169<br />

19<br />

52"<br />

77<br />

H56<br />

50<br />

H4<br />

H17<br />

H3<br />

H<strong>11</strong><br />

170

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!