02.02.2013 Views

5pm cst SATURDAYS (April 11 - June 30)

5pm cst SATURDAYS (April 11 - June 30)

5pm cst SATURDAYS (April 11 - June 30)

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Step <strong>11</strong> Rail Uprights Installation<br />

1. Place Rail Uprights with Handle Holes (27) on the ground and use a hammer to pound 1/4" T-Nuts<br />

(H32) into the Uprights (as shown in Detail A).<br />

2. In the locations shown, place Rail Uprights (25) and Rail Uprights with Handle Holes (27), with the<br />

T-Nuts towards the inside of the set, and attach to 6 Hole Facias (168), 4 Hole Facia with Rope<br />

Hole (52), and Corner Facias (29) using #8 Hardware (H155). Rail Uprights (25) (27) should be<br />

flush with the outside edge of the Corner Facias (29).<br />

*NOTE: #8 Hardware (H152) used to attach 1 x 4 Rail Uprights (6) is shorter than the #8<br />

Hardware (H155) used to attach 2 x 4 Rail Uprights (25) (27).<br />

3. Center 1 x 4 Rail Uprights (6) between Corner Uprights and 2 x 4 Rail Uprights (25) (27) and attach<br />

to Facias (29) (52) (168) using #8 Hardware (H152).<br />

4. Measure over 2 13/16" from Corner Upright (170) and attach first Upright (6) to Top Joist (77) and<br />

2 Hole Facia (28). Space the remaining Rail Uprights (6) approximately 2 13/16" apart and attach<br />

using #8 Hardware (H152).<br />

*NOTE: Gaps between Rail Uprights (6) must be less than 3 3/8". It may be necessary to<br />

adjust Rail Uprights (6) to ensure gaps are less than 3 3/8".<br />

29<br />

52<br />

6<br />

169<br />

168<br />

27<br />

27<br />

H155<br />

H32<br />

6<br />

6<br />

170<br />

H152<br />

2 13/16"<br />

29<br />

6 H152<br />

DETAIL A<br />

25<br />

77<br />

H32<br />

27<br />

170<br />

168<br />

6<br />

28<br />

29

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!