5pm cst SATURDAYS (April 11 - June 30)
5pm cst SATURDAYS (April 11 - June 30)
5pm cst SATURDAYS (April 11 - June 30)
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Step <strong>11</strong> Rail Uprights Installation<br />
1. Place Rail Uprights with Handle Holes (27) on the ground and use a hammer to pound 1/4" T-Nuts<br />
(H32) into the Uprights (as shown in Detail A).<br />
2. In the locations shown, place Rail Uprights (25) and Rail Uprights with Handle Holes (27), with the<br />
T-Nuts towards the inside of the set, and attach to 6 Hole Facias (168), 4 Hole Facia with Rope<br />
Hole (52), and Corner Facias (29) using #8 Hardware (H155). Rail Uprights (25) (27) should be<br />
flush with the outside edge of the Corner Facias (29).<br />
*NOTE: #8 Hardware (H152) used to attach 1 x 4 Rail Uprights (6) is shorter than the #8<br />
Hardware (H155) used to attach 2 x 4 Rail Uprights (25) (27).<br />
3. Center 1 x 4 Rail Uprights (6) between Corner Uprights and 2 x 4 Rail Uprights (25) (27) and attach<br />
to Facias (29) (52) (168) using #8 Hardware (H152).<br />
4. Measure over 2 13/16" from Corner Upright (170) and attach first Upright (6) to Top Joist (77) and<br />
2 Hole Facia (28). Space the remaining Rail Uprights (6) approximately 2 13/16" apart and attach<br />
using #8 Hardware (H152).<br />
*NOTE: Gaps between Rail Uprights (6) must be less than 3 3/8". It may be necessary to<br />
adjust Rail Uprights (6) to ensure gaps are less than 3 3/8".<br />
29<br />
52<br />
6<br />
169<br />
168<br />
27<br />
27<br />
H155<br />
H32<br />
6<br />
6<br />
170<br />
H152<br />
2 13/16"<br />
29<br />
6 H152<br />
DETAIL A<br />
25<br />
77<br />
H32<br />
27<br />
170<br />
168<br />
6<br />
28<br />
29