5pm cst SATURDAYS (April 11 - June 30)
5pm cst SATURDAYS (April 11 - June 30)
5pm cst SATURDAYS (April 11 - June 30)
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Step 18<br />
77<br />
H50<br />
H4<br />
H60<br />
H4<br />
H3<br />
H<strong>11</strong><br />
H50<br />
H17<br />
H28<br />
Swing Beam Installation<br />
1. Place Swing Beam Plate (N10) on top of Top Joist with Swing Holes (77) and attach through the two outside<br />
holes using 1/2" Hardware (H4) and 3/8" Hardware (H50) (H3) (H<strong>11</strong>) (H17).<br />
*NOTE: Do not tighten Hardware at this time.<br />
2. Lift the Swing Beam Assembly into position on top of the Swing Beam Plate (N10) and attach using 1/2"<br />
Hardware (H4) and 3/8" Hardware (H56) (H60) (H3) (H<strong>11</strong>) (H17).<br />
*NOTE: Check level of Swing Beam at this time. Slight adjustments can be made by adding or<br />
removing soil from under the Swing Beam Support. If Swing Beam cannot be leveled, remove<br />
Hardware in Support Plates (N<strong>11</strong>) and move to second set of holes on the Swing Beam.<br />
3. Tighten all Swing Beam hardware from Steps 15,16, and 18. Add 3/8" Acorn Nuts (H28) to Hardware in Swing<br />
Beam Plate (N10) and tighten.<br />
4. Attach Swing Options to Swing Hangers (N26) using Spring Clips (N27).<br />
*NOTE: Only three Swing Options can be attached at the same time.<br />
H56<br />
H4<br />
N10<br />
81<br />
37<br />
N26<br />
N27<br />
N<strong>11</strong>