02.02.2013 Views

5pm cst SATURDAYS (April 11 - June 30)

5pm cst SATURDAYS (April 11 - June 30)

5pm cst SATURDAYS (April 11 - June 30)

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Step 18<br />

77<br />

H50<br />

H4<br />

H60<br />

H4<br />

H3<br />

H<strong>11</strong><br />

H50<br />

H17<br />

H28<br />

Swing Beam Installation<br />

1. Place Swing Beam Plate (N10) on top of Top Joist with Swing Holes (77) and attach through the two outside<br />

holes using 1/2" Hardware (H4) and 3/8" Hardware (H50) (H3) (H<strong>11</strong>) (H17).<br />

*NOTE: Do not tighten Hardware at this time.<br />

2. Lift the Swing Beam Assembly into position on top of the Swing Beam Plate (N10) and attach using 1/2"<br />

Hardware (H4) and 3/8" Hardware (H56) (H60) (H3) (H<strong>11</strong>) (H17).<br />

*NOTE: Check level of Swing Beam at this time. Slight adjustments can be made by adding or<br />

removing soil from under the Swing Beam Support. If Swing Beam cannot be leveled, remove<br />

Hardware in Support Plates (N<strong>11</strong>) and move to second set of holes on the Swing Beam.<br />

3. Tighten all Swing Beam hardware from Steps 15,16, and 18. Add 3/8" Acorn Nuts (H28) to Hardware in Swing<br />

Beam Plate (N10) and tighten.<br />

4. Attach Swing Options to Swing Hangers (N26) using Spring Clips (N27).<br />

*NOTE: Only three Swing Options can be attached at the same time.<br />

H56<br />

H4<br />

N10<br />

81<br />

37<br />

N26<br />

N27<br />

N<strong>11</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!