5pm cst SATURDAYS (April 11 - June 30)
5pm cst SATURDAYS (April 11 - June 30)
5pm cst SATURDAYS (April 11 - June 30)
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Step 22<br />
N33<br />
H164 168<br />
H108<br />
Center Post &<br />
T-Bracket Installation<br />
*NOTE: Pre-drill all holes for Lag Bolts and #14 Hardware with appropriate drill bit.<br />
*NOTE: Center Posts (171) and 6 Hole Facias (168) should be flush on the bottoms (as<br />
shown in INSET A).<br />
1. Line up the larger center hole on T-Brackets (N33) with the top pre-drilled hole on 6 Hole Facia<br />
(168) and attach 6 Hole Facia (168), T-Bracket (N33), and Center Post (171) together using 1/4"<br />
Hardware (H1) and 5/16" Hardware (H108).<br />
2. Ensure T-Brackets (N33) and Center Posts (171) are square to 6 Hole Facias (168) and secure T-<br />
Brackets (N33) and Center Posts (171) into place using #14 Hardware (H164).<br />
3. Finish attaching Center Posts (171) to 6 Hole Facias (168) by inserting 1/4" Hardware (H1) and<br />
5/16" Hardware (H108) through the bottom hole of 6 Hole Facias (168).<br />
171<br />
H164<br />
41<br />
N33<br />
168<br />
N33<br />
INSET A<br />
171<br />
BOTTOMS<br />
FLUSH<br />
168<br />
H108<br />
H1