Install Water Tank (P) (if equipped):<br />

• A factory installed water tank is available in some<br />

regions. An optional water tank kit is available for all<br />

regions.<br />

• If water tank was previously installed on machine, read<br />

these instructions to verify that installation is correct. Follow<br />

all WARNINGS for installation and use of the Water<br />

Tank.<br />

• Verify the contents of the Water Tank Kit See Diagram at<br />

right.<br />

. Temporarily remove the right hand (same side of machine<br />

as engine starter rope) NUT from Lifting Eye (O).<br />

See diagram at right.<br />

. Install CLAMP supplied in Water Tank Kit (P), and then<br />

reinstall the NUT. See diagram at right.<br />

3. Torque as specified below, and diagram at right.<br />

8<br />

NOTICE<br />

Torque Lifting Eye NUT to 83 N-m (61 lb-ft) minimum.<br />

WARNING!<br />

Torque NUT as specified, else failure of LIFTING EYE<br />

(O) could occur. Injury or death could occur if LIFT-<br />

ING EYE fails while lifting machine.<br />