13.04.2013 Aufrufe

3/2011 - GdF Gewerkschaft der Flugsicherung eV

3/2011 - GdF Gewerkschaft der Flugsicherung eV

3/2011 - GdF Gewerkschaft der Flugsicherung eV

MEHR ANZEIGEN
WENIGER ANZEIGEN

Erfolgreiche ePaper selbst erstellen

Machen Sie aus Ihren PDF Publikationen ein blätterbares Flipbook mit unserer einzigartigen Google optimierten e-Paper Software.

<strong>der</strong> fl ugleiter <strong>2011</strong>/03 Editorial<br />

4<br />

Communique<br />

Frankfurt, 25 th May <strong>2011</strong><br />

Operation FABEC headed nowhere…<br />

as predicted.<br />

Performance and institutional questions are linked. It is impossible<br />

to drive one without addressing the other. In the<br />

absence of any institutional roadmap, of any fi nal objective<br />

related to service provision, FABEC is headed for complete<br />

standstill, despite all the good will and the technical justifi -<br />

cations of operational projects.<br />

A more effi cient airspace design is possible and can be<br />

found. However, it can only be implemented if the institutional<br />

setup makes it possible. The so-called DOVER project is,<br />

sadly, just about to prove us right. Despite positive feedbacks<br />

from experts and despite the technical and operational<br />

positive elements it entails, it will most probably not<br />

become a reality because it could lead to transferring major<br />

traffi c fl ows from one provi<strong>der</strong> to another. Which must, in the<br />

present FABEC competitive context, simply be unacceptable<br />

for any provi<strong>der</strong> or stakehol<strong>der</strong>.<br />

States must realise that they put their ANSP and staff in an<br />

impossible situation: sound and valid solutions are established,<br />

only to be left away, because any further airspace- or<br />

service- delegation is not acceptable in the present context.<br />

With a MOSAIC single provi<strong>der</strong>, that issue would be solved<br />

instantly, as the question of income linked to traffi c fl ows<br />

would not interfere. Operational solutions (such as the<br />

DOVER workgroup proposals) could be implemented as and<br />

when needed.<br />

MARC members are still waiting to start their participation<br />

to Social Dialogue at FABEC level. We have accepted the proposed<br />

Terms of Reference for the FABEC Social Dialogue<br />

Committee, established on the principles of the works councils,<br />

as recommended by the European Commission.<br />

MARC represent the vast majority of operational staff<br />

employed by the seven provi<strong>der</strong>s of the six FABEC states.<br />

Its membership comprises operational staff controllers,<br />

technicians and engineers.

Hurra! Ihre Datei wurde hochgeladen und ist bereit für die Veröffentlichung.

Erfolgreich gespeichert!

Leider ist etwas schief gelaufen!