27.04.2013 Aufrufe

Supraleitendes Gravimeter - Institut für Geophysik - Universität ...

Supraleitendes Gravimeter - Institut für Geophysik - Universität ...

Supraleitendes Gravimeter - Institut für Geophysik - Universität ...

MEHR ANZEIGEN
WENIGER ANZEIGEN

Erfolgreiche ePaper selbst erstellen

Machen Sie aus Ihren PDF Publikationen ein blätterbares Flipbook mit unserer einzigartigen Google optimierten e-Paper Software.

3. GEP-3 Remote Control Card with 16 bit A/D converter and<br />

multiplexer;<br />

4. Remote Control Computer Interface and software<br />

5. Voltage Transfer Standard<br />

6. Trimble GPS Receiver (Smart Antenna) with 30 meter cable;<br />

7. User Interface PC (UIPC) running Microsoft Windows;<br />

8. UIPC Data Acquisition Software;<br />

9. Gigabit Ethernet;<br />

10. Lightening protection (GPS signal and power, LAN interface);<br />

11. All necessary cabling.<br />

3 CEH-15M: Compressor extension hoses, 200 meters; or alternative method for<br />

operating and cooling the compressor inside the BFO mine<br />

4 GWR-OG 4KCS: Second (spare) GWR-OG 4 Kelvin Cryocooler System,<br />

includes coldhead, compressor, hoses, and GWR support arm. Allows coldhead<br />

exchange by minimally trained personnel.<br />

SUB-TOTAL<br />

Page 2<br />

$ 12,300<br />

$ 31,800<br />

US $ 598,380<br />

5 Installation and training by GWR personnel at customer’s site $ 9,700<br />

6 Training at GWR, San Diego for 3 persons for 7 days training, not including air<br />

travel, hotel, and per diem<br />

TOTAL<br />

$ 6,400<br />

US $ 614,480<br />

TOTAL US$.......614,480<br />

Terms and conditions:<br />

• All Prices are in US dollars (USD).<br />

• Total Price is DDU (Delivery Duty unpaid), Black Forest Observatory, Wolfach, Germany;<br />

and includes shipping and insurance to the installation site.<br />

• Delivery 9 to 12 months upon acceptance of order and letter of credit.<br />

• One year warranty period after completion date of installation.<br />

• Quote valid for 6 months.<br />

• Payment terms: Payment by irrevocable letter of credit; 90% paid upon delivery; and<br />

remaining 10% after successful installation and acceptance by customer.<br />

• All taxes, duties, VAT or other expenses are the responsibility of the purchaser.<br />

Authorized by:<br />

Richard Warburton

Hurra! Ihre Datei wurde hochgeladen und ist bereit für die Veröffentlichung.

Erfolgreich gespeichert!

Leider ist etwas schief gelaufen!