Ever since its first issue in 1956, the atw – International Journal for Nuclear Power has been a publisher of specialist articles, background reports, interviews and news about developments and trends from all important sectors of nuclear energy, nuclear technology and the energy industry. Internationally current and competent, the professional journal atw is a valuable source of information. www.nucmag.com
Ever since its first issue in 1956, the atw – International Journal for Nuclear Power has been a publisher of specialist articles, background reports, interviews and news about developments and trends from all important sectors of nuclear energy, nuclear technology and the energy industry. Internationally current and competent, the professional journal atw is a valuable source of information.
www.nucmag.com
Sie wollen auch ein ePaper? Erhöhen Sie die Reichweite Ihrer Titel.
YUMPU macht aus Druck-PDFs automatisch weboptimierte ePaper, die Google liebt.
atw Vol. 67 (2022) | Ausgabe 4 ı Juli
48
Gundremmingen C
REPORT
Operating sequence in 2021
Electrical output in %
100
90
80
70
60
50
40
30
20
10
0
January February March April May June July August September October November December
In the review period 2021, unit C of Gundremmingen nuclear
100
power plant was operated at full load. A gross total of
11,428,585 80 MWh of electricity was produced in 2021. This was the
best-ever operating result achieved since date of commercial
60
operation.
On 40 9 March 2021 the plant location achieved 700 billion kWh of
gross generation.
20
From 16 October 2021 unit C was in stretch-out operation because
of its permanent shutdown.
0
On 31 December 2021, unit C was permanently shut down due to
the revision of the German Atomic Energy Act in 2011. Since the
100
beginning of commercial operation in 1985, unit C produced, with
a 80time availability of up to 89 %, a gross total of up to
360,000,000 MWh of electricity.
60
Planned shutdowns
40
31 December: Permanent shutdown.
20
0
Unplanned shutdowns and reactor/turbine trip
None.
Power reductions above 10 % and longer than for 24 h
24 – 25 January: period tests (35.3 h).
6 – 9 June: period tests and maintenance work (67.3 h).
5 – 6 September: period tests (36.0 h).
16 October – 31 December: Stretch-out operation.
Delivery of fuel elements
In 2021, no fresh fuel elements were delivered.
Waste management status
In 2021, a total of 23 CASTOR © casks were loaded. Thus, at
the end of 2021, 103 CASTOR © casks with each 52 spent fuel
elements out of units B and C are stored in the local interim
storage.
General points
On 5 May 2021, a recertification audit according to OHRIS
was successfully carried out.
Positionierung:
Bezug, links, unten
X = 20,475 Y = 95,25 B = 173,5 H = 38,2
VGB: HKS6K 30 %
atw: 100 60 0 0
Report
Operating results 2021