11.07.2022 Aufrufe

atw - International Journal for Nuclear Power | 04.2022

Ever since its first issue in 1956, the atw – International Journal for Nuclear Power has been a publisher of specialist articles, background reports, interviews and news about developments and trends from all important sectors of nuclear energy, nuclear technology and the energy industry. Internationally current and competent, the professional journal atw is a valuable source of information. www.nucmag.com

Ever since its first issue in 1956, the atw – International Journal for Nuclear Power has been a publisher of specialist articles, background reports, interviews and news about developments and trends from all important sectors of nuclear energy, nuclear technology and the energy industry. Internationally current and competent, the professional journal atw is a valuable source of information.

www.nucmag.com

MEHR ANZEIGEN
WENIGER ANZEIGEN

Erfolgreiche ePaper selbst erstellen

Machen Sie aus Ihren PDF Publikationen ein blätterbares Flipbook mit unserer einzigartigen Google optimierten e-Paper Software.

atw Vol. 67 (2022) | Ausgabe 4 ı Juli

53

Operating data

Review period 2021

REPORT

Plant operator: EnBW Kernkraft GmbH (EnKK)

Shareholder/Owner: EnBW Erneuerbare und Konventionelle

Erzeugung AG (98,45 %), ZEAG Energie AG, Deutsche Bahn AG,

Kernkraftwerk Obrigheim GmbH

Plant name: Kernkraftwerk Neckarwestheim II (GKN II)

Address: EnBW Kernkraft GmbH, Kernkraftwerk Neckarwestheim,

Im Steinbruch, 74382 Neckarwestheim, Germany

Phone: 07133 13-0, Telefax: 07133 17645

E-mail: poststelle-gkn@kk.enbw.com

Web: www.enbw.com

First synchronisation: 01-03-1989

Date of commercial operation: 04-15-1989

Design electrical rating (gross):

1,400 MW

Design electrical rating (net):

1,310 MW

Reactor type:

PWR

Supplier:

Siemens/KWU

100

90

80

70

60

50

40

93

Availability factor in %

Capacity factor in %

93

94

89

81

88

93

92

The following operating results were achieved:

Operating period, reactor:

8,097 h

Gross electrical energy generated in 2021: 11,151,300 MWh

Net electrical energy generated in 2021: 10,459,253 MWh

Gross electrical energy generated since

first synchronisation until 12-31-2021:

362,506,184 MWh

Net electrical energy generated since

first synchronisation until 12-31-2021:

339,049,716 MWh

Availability factor in 2021: 92.36 %

Availability factor since

date of commercial operation: 92.90 %

Capacity factor 2021: 92.32 %

Capacity factor since

date of commercial operation: 92.55 %

Downtime

(schedule and forced) in 2021: 7.64 %

Number of reactor scrams 2021: 0

30

20

10

0

10

9

8

7

93

2014

93

95

89

81

94

2015 2016 2017 2018 2019 2020

Collective radiation dose of own

and outside personnel in Sv

94

92

2021

6

Licensed annual emission limits in 2021:

Emission of noble gases with plant exhaust air:

1.0 · 10 15 Bq

5

Emission of iodine-131 with plant exhaust air: 1.1 · 10 10 Bq

Emission of nuclear fission and activation products

with plant waste water (excluding tritium):

6.0 · 10 10 Bq

4

3

Proportion of licensed annual emission limits

for radioactive materials in 2021 for:

Emission of noble gases with plant exhaust air: 0.0112 %

Emission of iodine-131 with plant exhaust air: < limit of detection

Emission of nuclear fission and activation products

with plant waste water (excluding tritium):

< limit of detection

Collective dose:

0.093 Sv

2

1

0

0.10

2014

0.12

2015

0.08

2016

0.15

2017

0.12 0.10

2018 2019

0.08

2020

0.09

2021

Report

Operating results 2021

Hurra! Ihre Datei wurde hochgeladen und ist bereit für die Veröffentlichung.

Erfolgreich gespeichert!

Leider ist etwas schief gelaufen!