13.02.2013 Aufrufe

Hydraulikpresse 2 | 2011 - Hansa Flex

Hydraulikpresse 2 | 2011 - Hansa Flex

Hydraulikpresse 2 | 2011 - Hansa Flex

MEHR ANZEIGEN
WENIGER ANZEIGEN

Sie wollen auch ein ePaper? Erhöhen Sie die Reichweite Ihrer Titel.

YUMPU macht aus Druck-PDFs automatisch weboptimierte ePaper, die Google liebt.

important requirement for optimal operation of the<br />

equipment. the customer completely agrees and<br />

the next day, a fluid service emergency vehicle is<br />

on site. the fluid engineers take oil samples directly<br />

from the machines and assess them right away in<br />

the vehicle. after a short time, they are able to determine<br />

whether the oil is contaminated, whether<br />

there is water in the oil and whether there is possibly<br />

a mix of different oils which do not blend together.<br />

these results are presented to the customer using photographs and diagrams. if<br />

he wishes, the customer may also be present as the samples are assessed and take<br />

a look down the microscope for himself.<br />

on the basis of the data extracted, further measures can be recommended. a bypass<br />

flow filter system can be used to filter the hydraulic oil while the production<br />

machine is running. no machine down time is necessary. if the oil is too polluted or<br />

has become contaminated by other fluids such as water, for example, a complete<br />

oil change is recommended. and our fluid engineers are of course the first point<br />

of contact when machines need to be converted to biologically degradable oils.<br />

indusTrial assemBly opTimised<br />

the technical consultant drives to the debriefing with the customer. he discusses<br />

the mobile rapid hydraulic service’s and the fluid service’s past deployments with<br />

the workshop manager. the customer is particularly impressed with the speed and<br />

professionalism. he then reports that he has for some time suspected that one of<br />

HYDRAULIKPRESSE 2|<strong>2011</strong><br />

neWs akTuelles<br />

less Than half an hour<br />

laTer The emergency vehicle<br />

is WiTh The cusTomer<br />

his machines is not running optimally despite having new hose lines and clean<br />

oil. our technical consultant suggests also bringing industrial assembly on board.<br />

his colleagues there analyse the current situation and document it for the customer<br />

and for their hansa-fLeX colleagues in dresden-Weixdorf. With the data<br />

extracted, Weixdorf is able to simulate the machine and thus identify any losses<br />

of flow. they can also use repeated new simulations to adjust various components<br />

and thus optimise efficiency. on the basis of the data from Weixdorf, industrial<br />

service discusses the further process with the technical consultant, the customer<br />

and the branch. the modified components are prepared in the nearest branch and<br />

supplied to the customer where industrial service builds them into the equipment.<br />

and the very next day, the machine is operating at optimum efficiency.<br />

this example can be expanded in any direction. depending on the customer’s circumstances,<br />

the sealing technology, pipe bending centre, plant construction or<br />

metal hoses divisions may also get involved. because hansa-fLeX is truly a onestop-shop<br />

- every time. ¡<br />

die neuen xWorld fahrzeuge<br />

die neuen Xworld FaHrZeuGe<br />

auf der diesjährigen hannover Messe konnten die<br />

besucher zum ersten Mal ein exemplar der neuen<br />

geländewagen bestaunen, die bei der XWorLd südamerika<br />

zum einsatz kommen. die vW amarok sind<br />

speziell für fahrten im unwegsamen gelände umgerüstet<br />

worden. direkt nach der Messe wurden die<br />

fahrzeuge verladen, um sie auf dem seeweg pünktlich<br />

zum tourstart nach buenos aires zu bringen.<br />

at this year‘s hanover Messe, visitors got their first<br />

glimpse of the new off-road vehicles that will be used<br />

during the XWorLd south america. the vW amaroks<br />

have been specially equipped for journeys across<br />

rough terrain. immediately following the trade fair,<br />

the vehicles were loaded up to get them by sea to<br />

buenos aires in time for the start of the tour.<br />

11

Hurra! Ihre Datei wurde hochgeladen und ist bereit für die Veröffentlichung.

Erfolgreich gespeichert!

Leider ist etwas schief gelaufen!