<strong>Asian</strong> <strong>Development</strong> <strong>Bank</strong> TA7343 Ho Chi Minh City MRT Line 2 Project<br />
MVA Asia Ltd <strong>Final</strong> <strong>Report</strong> – November 2010<br />
Figure 3.2 “Optimised” HCMC MRT Master Plan<br />
3.3.4 Analysis was undertaken of various master plan improvement options using the transport<br />
forecasting models under TA4862. The alignment and engineering feasibility of the options<br />
was also briefly reviewed in determining the preferred solutions. The indicative estimated<br />
changes and benefits of the proposed modifications to the master plan are summarized in<br />
Table 3.2-1 below. As can be seen, the improvements require an increase in MRT network of<br />
11%, but increase in investment of only 8%, and yet a revenue increase of 16%.<br />
3-4