<strong>Asian</strong> <strong>Development</strong> <strong>Bank</strong> TA7343 Ho Chi Minh City MRT Line 2 Project<br />

MVA Asia Ltd <strong>Final</strong> <strong>Report</strong> – November 2010<br />

Figure 3.2 “Optimised” HCMC MRT Master Plan<br />

3.3.4 Analysis was undertaken of various master plan improvement options using the transport<br />

forecasting models under TA4862. The alignment and engineering feasibility of the options<br />

was also briefly reviewed in determining the preferred solutions. The indicative estimated<br />

changes and benefits of the proposed modifications to the master plan are summarized in<br />

Table 3.2-1 below. As can be seen, the improvements require an increase in MRT network of<br />

11%, but increase in investment of only 8%, and yet a revenue increase of 16%.<br />