<strong>Asian</strong> <strong>Development</strong> <strong>Bank</strong> TA7343 Ho Chi Minh City MRT Line 2 Project<br />

MVA Asia Ltd <strong>Final</strong> <strong>Report</strong> – November 2010<br />

Table 4.1 Indicative Costs for potential CTF / Sustainable Transport Projects<br />

Project Details Indicative Cost $US million<br />

Bus Restructuring and<br />

Reform for HCMC<br />

Bus Feeder Services for<br />

Line 2<br />

• Bus route planning for before and<br />

after the MRT<br />

• Support to PC to facilitate changes<br />

to the management and operation of<br />

the bus network<br />

• Implementation of bus priority<br />

measures<br />

• Introduction of fuel Efficient buses<br />

• Fuel efficient buses (100)<br />

• Bus stop infrastructure (20 bus<br />

stops)<br />

• Route planning<br />

4-13<br />

• 1 – 2 million for city wide study<br />

• 20 – 50 million for<br />

implementation (of bus priority<br />

measures, technology and<br />

buses)<br />

Fuel efficient buses cost approx<br />

100,000).<br />

• 10 - 15 million<br />

• 1 – 3 million<br />

• 1 million<br />

• Total approx 12 – 20 million<br />

BRT Extension to Line 2 • Implementation of route (e.g. 10km) • 10 - 15 million<br />

Station Interchanges for<br />

Line 2<br />

• Study / feasibility of facilities<br />

• Major PTI at outer terminal station<br />

• Park & Ride at terminal<br />

• Intermodal facilities along route<br />

Transport Policy for HCMC • Consultant support to PC to create<br />

sustainable transport policy<br />

including private vehicle demand<br />

policies<br />

Pedestrian Access to Line<br />

2 Stations<br />

• Study / Feasibility of facilities<br />

• Pedestrian / cycle access<br />

improvements to stations<br />

Projects to be Funded from other Resources<br />

• 0.5 - 1 million<br />

• 10 million<br />

• 5 – 10 million<br />

• 5 million<br />

• Total approx 20 – 30 million<br />

• 0.5 million<br />

• 0.5 – 1 million<br />

• 2 – 3 million<br />

• 3 – 4 million<br />

4.8.11 Projects that could be eligible for funding outside of CTF either using Line 2 Tranche 1<br />

funding or other World <strong>Bank</strong> / ADB or GoV funds could be:<br />

Bus restructuring study for entire city<br />

Bus Feeder services and BRT extensions to serve entire MRT network<br />

Accessibility and Interchange facilities for bus and MRT network<br />

Integrated Ticketing System for whole public transport network<br />

<strong>Development</strong> of sustainable transport policies city / nation wide<br />

Fuel Efficient Vehicle Implementation Study