Final Report - Asian Development Bank
Final Report - Asian Development Bank
Final Report - Asian Development Bank
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Asian</strong> <strong>Development</strong> <strong>Bank</strong> TA7343 Ho Chi Minh City MRT Line 2 Project<br />
MVA Asia Ltd <strong>Final</strong> <strong>Report</strong> – November 2010<br />
Table 4.1 Indicative Costs for potential CTF / Sustainable Transport Projects<br />
Project Details Indicative Cost $US million<br />
Bus Restructuring and<br />
Reform for HCMC<br />
Bus Feeder Services for<br />
Line 2<br />
• Bus route planning for before and<br />
after the MRT<br />
• Support to PC to facilitate changes<br />
to the management and operation of<br />
the bus network<br />
• Implementation of bus priority<br />
measures<br />
• Introduction of fuel Efficient buses<br />
• Fuel efficient buses (100)<br />
• Bus stop infrastructure (20 bus<br />
stops)<br />
• Route planning<br />
4-13<br />
• 1 – 2 million for city wide study<br />
• 20 – 50 million for<br />
implementation (of bus priority<br />
measures, technology and<br />
buses)<br />
Fuel efficient buses cost approx<br />
100,000).<br />
• 10 - 15 million<br />
• 1 – 3 million<br />
• 1 million<br />
• Total approx 12 – 20 million<br />
BRT Extension to Line 2 • Implementation of route (e.g. 10km) • 10 - 15 million<br />
Station Interchanges for<br />
Line 2<br />
• Study / feasibility of facilities<br />
• Major PTI at outer terminal station<br />
• Park & Ride at terminal<br />
• Intermodal facilities along route<br />
Transport Policy for HCMC • Consultant support to PC to create<br />
sustainable transport policy<br />
including private vehicle demand<br />
policies<br />
Pedestrian Access to Line<br />
2 Stations<br />
• Study / Feasibility of facilities<br />
• Pedestrian / cycle access<br />
improvements to stations<br />
Projects to be Funded from other Resources<br />
• 0.5 - 1 million<br />
• 10 million<br />
• 5 – 10 million<br />
• 5 million<br />
• Total approx 20 – 30 million<br />
• 0.5 million<br />
• 0.5 – 1 million<br />
• 2 – 3 million<br />
• 3 – 4 million<br />
4.8.11 Projects that could be eligible for funding outside of CTF either using Line 2 Tranche 1<br />
funding or other World <strong>Bank</strong> / ADB or GoV funds could be:<br />
Bus restructuring study for entire city<br />
Bus Feeder services and BRT extensions to serve entire MRT network<br />
Accessibility and Interchange facilities for bus and MRT network<br />
Integrated Ticketing System for whole public transport network<br />
<strong>Development</strong> of sustainable transport policies city / nation wide<br />
Fuel Efficient Vehicle Implementation Study