<strong>Asian</strong> <strong>Development</strong> <strong>Bank</strong> TA7343 Ho Chi Minh City MRT Line 2 Project<br />

MVA Asia Ltd <strong>Final</strong> <strong>Report</strong> – November 2010<br />

Figure 3.3 “Latest” HCMC MRT Master Plan<br />

Line 3B<br />

3.4.6 One of the main reasons of the recommended Line 1 – Line 3A proposal in the Optimised<br />

Master Plan was to avoid having an MRT line terminating in the city centre. The Latest<br />

Master Plan replaces a terminating Line 1 with a terminating Line 3B, and thus defeats the<br />

objective. This is not considered desirable, but clearly needs further study.<br />

3.4.7 The Line 3B (Dien Bien Phu) as proposed in the Optimised Master Plan was an integral and<br />

complimentary part of the Line 1 – Line 3A proposal. To do one without the other would<br />

result in a far less optimal network.<br />