search<strong>in</strong>g. Primary data was collected by means <strong>of</strong> a questionnaire survey <strong>in</strong> different poultry<br />

farms.<br />

3.3.1 Secondary Data Collection<br />

Different concern <strong>in</strong>stitutions/ organizations were visited to collect necessary <strong>in</strong>formation for<br />

the study. <strong>Poultry</strong> sector related data were collected <strong>from</strong> Department <strong>of</strong> Livestock Services<br />

(DLS) and Office <strong>of</strong> the District Livestock Officer, Gazipur. Biogas related data were<br />

collected <strong>from</strong> Grameen Shakti, GTZ Bangladesh, Local Government Eng<strong>in</strong>eer<strong>in</strong>g<br />

Department (LGED) and Bangladesh Council <strong>of</strong> Scientific and Industrial Research (BCSIR).<br />

Energy related data were collected <strong>from</strong> Bangladesh Power Development Board (BPDB),<br />

Rural Electrification Board (REB), Power Cell, Titas Gas Transmission and Distribution<br />

Company Limited (TGTDCL). <strong>The</strong> country <strong>in</strong>formation and the study area <strong>in</strong>formation were<br />

collected <strong>from</strong> Bangladesh Bureau <strong>of</strong> Statistics (BBS). <strong>The</strong> different organizations mentioned<br />

above were visited, discussions with relevant <strong>of</strong>ficials were held, and the relevant literatures,<br />

documents and publications were collected. Besides, <strong>in</strong>ternet search<strong>in</strong>g was done and various<br />

relevant files <strong>from</strong> different web sites were downloaded.<br />

3.3.2 Primary Data Collection<br />

Primary data was collected by means <strong>of</strong> a questionnaire survey (a copy <strong>of</strong> this is attached as<br />

annex A) and <strong>in</strong>terview with the poultry farmers. Questions were asked to know about the<br />

present energy consumption, deficit <strong>of</strong> energy supply, backup system, the problems fac<strong>in</strong>g<br />

with the technology, size <strong>of</strong> biogas plant, use <strong>of</strong> slurry, the <strong>in</strong>terest <strong>of</strong> the farmers to produce<br />

electricity, and the barriers to dissem<strong>in</strong>ate the technology.<br />

3.4 Data Analysis<br />

All the quantitative data collected <strong>from</strong> the field were encoded <strong>in</strong> Micros<strong>of</strong>t Excel program<br />

and then analyzed. F<strong>in</strong>ancial analysis was done to f<strong>in</strong>d out the different sizes <strong>of</strong> poultry farm<br />

which are economically viable to produce electricity. <strong>The</strong> follow<strong>in</strong>g <strong>in</strong>dexes were determ<strong>in</strong>ed<br />

<strong>in</strong> the analysis such as Net present value (NPV), Internal Rate <strong>of</strong> Return (IRR) and Payback<br />

Period. Different sizes <strong>of</strong> poultry farms ranges <strong>from</strong> 500 birds to 50000 birds were considered<br />

for f<strong>in</strong>ancial analysis. Each <strong>of</strong> the farms was analyzed for different cases under different<br />

scenarios to f<strong>in</strong>d the m<strong>in</strong>imum size <strong>of</strong> farm which is f<strong>in</strong>ancially viable to produce electricity.<br />

<strong>The</strong> m<strong>in</strong>imum size <strong>of</strong> f<strong>in</strong>ancially viable poultry farm was then used to estimate the total<br />

potential <strong>of</strong> electricity production for different cases under different scenarios. In the<br />

f<strong>in</strong>ancial analysis the follow<strong>in</strong>g issues were considered such as exist<strong>in</strong>g electricity tariff,<br />