05.03.2013 Views

Integrated Circuit Manufacturing

Integrated Circuit Manufacturing

Integrated Circuit Manufacturing

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Nano & Micro Systems<br />

Institute of Physics<br />

Change of operating time:<br />

Presentation Institute of Physics<br />

The operating time (the time a throw takes) is not always constant.<br />

Assume this time is normally distributed with a mean of 2 sec and<br />

standard deviation 0,05 sec. The code has to be<br />

use R_process(1) for n 2, 0.05 sec<br />

For an exponential distribution:<br />

use R_process(1) for e 2 sec<br />

Think about the impact if you change this only for one, more than one or all of the tools<br />

Execution of the changes:<br />

- Go to line 49, here the routine for tools 1 starts (it ends in line 63)<br />

- Replace in line 56 the "use R-process“ command<br />

- If desired go to the next tool -> line 65 ...<br />

- If desired replace it for every tool<br />

- Quit the editor: , <br />

Execution of the simulation:<br />

- Select the simulation window "ex001/proc“ and -> -> compiling<br />

-> simulation window appears -> -> <br />

- Again you need two operating points!<br />

Operating the program<br />

Prof.Dr. W. Hansch, Dipl.-Ing. Tina Kubot<br />

13

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!