Nano & Micro Systems<br />

Institute of Physics<br />

Attention !<br />

- Within the limited time of the tutorial (3 hours) you can not simulate many parameters. It will take some time to get into the program and to<br />

think through what to change and to understand and write down the results. For every operation curve you will need two operating points<br />

and to simulate these two points and calculate the necessary parameters.<br />

For thinking about your simulations at home, copy the program and the example to an USB stick.<br />

- Before you change anything think through if the changes have to be applied to only one or all elements<br />

Carefully write down the changes you made, otherwise you will have problems to understand your results<br />

- Do not change more than one parameter at the same time, otherwise you can not tell what change had what effect. After some trials you<br />

can change more than one parameter to get the optimal operation curve<br />

- Always take care that your operation curves are comparable. If you change capacity for example you get a NEW operation curve, as capa<br />

and alpha will change. Keep in mind if you are simulation another operating point of the same operation curve or a different operation<br />

curve.<br />

Possibilities:<br />

1) "resources" -> R_process -> edit : - Change of the statistics of the process time, which is "constant“ in the beginning<br />

e.g. To exponential or normal distribution<br />

(what about theory ? Can you reproduce the Kingman equation ?)<br />

-> Attention: Does the change has to be applied to all of the tools or only one?<br />

- Number of lots in the machine at the same time<br />

(does it make sense ? What result do you expect and which information can you find?)<br />

2) "resources" -> RC_pause -> edit : - change of the offline characteristics<br />

Presentation Institute of Physics<br />

Which changes make sense?<br />

3) "Queues" -> "Q_process_wait" and "Q_process" -> edit: - restriction of the stock/queues<br />

(What do you think how the operation curve will change ?<br />

Which restriction makes sense compared to the restriction of the<br />

production capacity = number on the dice or lot size = batch ?)<br />

Prof.Dr. W. Hansch, Dipl.-Ing. Tina Kubot<br />