LOCATION<br />

GOLEN GOL HYDROPOWER PROJECT<br />

The project is located on Golen Gol Nullah, a tributary<br />

of Mastuj River, 25 Km from Chitral Town in Khyber<br />

Pakhtunkhwa. The project is about 550 km from<br />

Islamabad.<br />

On completion this project will produce 106 MW with<br />

annual energy 436 million KWh. The construction period is<br />

4 years. The contract for the main dam has been awarded to<br />

M/s SAMBU-SARCO JV (Korean Firm) which has<br />

commenced its activities. Pre-qualification of Transmission<br />

Lines has also been completed. The Consultancy Agreement<br />

for construction supervision has been awarded to M/s Fichtner JV. (Germany)<br />

SALIENT FEATURES<br />

Installed Capacity 106 MW<br />

Gross Head 435 m<br />

Design Discharge 30 m 3 /sec<br />

Mean Annual Energy 436 GWh<br />

No. & type of Turbine 3, Pelton<br />

Estimated Project Cost US$ 130 Million<br />

Implementation Period 4 years<br />

PRESENT STATUS<br />

Feasibility Study completed by HEPO/GTZ in 1997 is updated in 2005.<br />

Study for Detailed Design and preparation of Tender Documents completed by a joint<br />

venture of PES, FICHTNER, Engineering Associates.<br />

Construction of O&M <strong>WAPDA</strong> Staff Colony is in progress and will be completed in<br />

2011.<br />

Lot-2 & Lot-3.1 Civil Works & Power house, the contract has been awarded to M/s<br />

SAMBU, agreement signed and the contractor is being mobilized.<br />

Pre-qualification of contractor for Lot-3.2 E&M Works has been finalized and tender<br />

documents issued to the contractor and last date of submission is extended upto<br />

31.03.2011.<br />

Pre-qualification documents of firms for Lot-4 Transmission Line have been vetted by<br />

the Donors and Tender will be floated shortly.<br />

M/s Fichtner-PES-DMC-BAK JV has been appointed consultants for construction<br />

supervision.<br />

Cost of Works has been agreed by the following donors:<br />

- Saudi Development Fund for Civil Works (US$ 40 Million)<br />

- Kuwait Development Fund for E&M Works (US$ 37 Million)<br />

- OPEC for Transmission Lines (US$ 30 Million)