LOCATION<br />

YULBO HYDROPOWER PROJECT<br />

The dam site is to be located on Indus<br />

River 6 km upstream of Silbo and Yulbo<br />

villages and the powerhouse is some 9<br />

km upstream of village Shengus in<br />

Skardu District (Tehsil Dambudas).<br />

LAYOUT<br />

The dam axis is located some 1 Km<br />

downstream of the Astak Nala 92 Km<br />

downstream of Skardu Town. The river is<br />

about 80 m wise at this site. The<br />

headrace tunnels would be about 12 km<br />

on the right bank of Indus river. The<br />

powerhouse would be underground<br />

approximately 7 km downstream of<br />

Chutran village.<br />

SALIENT FEATURES<br />

Generation Capacity 2800 MW<br />

Drainage Area 114,200 Km 2<br />

Average Flow 990 m 3 /s<br />

Dam Height 140 m<br />

Head Water Level 1920 m<br />

Tail Water Level 1796 m<br />

Length of Power Tunnel 12.1 km<br />

Gross Head 238 m<br />

Net Head 211 m<br />

Design Discharge 1500 m 3 /s<br />

Annual Energy 11400 GWh<br />

Plant Factor 45.8%<br />

PRESENT STATUS<br />

The project is identified by MECO under CIDA grant during 1984 for a capacity of 710<br />

MW.<br />

Desk Study and field reconnaissance done.<br />

The capacity has been upgraded 2800 MW by HPO, <strong>WAPDA</strong>.