22.03.2013 Views

WAPDA VISION-2025

WAPDA VISION-2025

WAPDA VISION-2025

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

LOCATION<br />

TRAPPI HYDROPOWER PROJECT<br />

The project area is located on the Sirran River near<br />

Trappi Village. The Project is 18 km from Mansehra<br />

in Khyber Pakhtunkhwa Province and about 160 km<br />

from Islamabad.<br />

SALIENT FEATURES<br />

Installed capacity 32 MW<br />

Mean Annual Energy 232 GWh<br />

Maximum gross head 171 m<br />

Dam height 146 m<br />

Dam Crest 450 m<br />

Reservoir Maximum<br />

Operating Level<br />

2600 ft<br />

Tentative Live Storage 200,000 Acre-ft<br />

Pressure pipe/tunnel 1500 m<br />

Design discharge 25 m 3 /s<br />

Plant factor 80.9%<br />

Feasibility Study 18 months<br />

PRESENT STATUS<br />

Project identified by Hydro Planning Organization (HPO), <strong>WAPDA</strong>.<br />

Reconnaissance study was carried out by HPO and Reconnaissance Report issued in May<br />

2010.<br />

Commitment for a grant of Euro 950,000 for financing the feasibility study of the project<br />

was made by KfW on 17 th January, 2011.<br />

Financial Agreement signed by KfW, <strong>WAPDA</strong> and Government of Pakistan on July 15,<br />

2011.<br />

TOR/EOI has been finalized and will be published in the Newspaper as soon as PC-II is<br />

approved.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!