WAPDA VISION-2025
WAPDA VISION-2025
WAPDA VISION-2025
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
PROVINCE WISE PROFILE OF EXISTING<br />
INSTALLED HYDEL GENERATION CAPACITY (MW)<br />
PERIOD PUNJAB SINDH KPK BALOCHISTAN AJK TOTAL<br />
PRE-<strong>WAPDA</strong> 23 0 44 0 0 67<br />
1958~80 63 0 904 0 600 1567<br />
1981~00 109 0 3766 0 1000 4875<br />
2001~06 1697 0 3766 0 1000 6463<br />
UPTO<br />
2011<br />
Private-AJK<br />
(2000)<br />
1697 0 3819 0 1000 6516*<br />
0 0 0 0 30 30<br />
UNDER IMPLEMENTATION PROJECTS<br />
S# Project River Location<br />
Storage<br />
(MAF)<br />
Power<br />
(MW)<br />
Tentative Project<br />
Commissioning<br />
1. Gomal Zam Dam Gomal SWA/KPK 1.140 17.4 2013<br />
2.<br />
3.<br />
Allai Khwar<br />
Hydropower<br />
Duber Khwar<br />
Hydropower<br />
Indus<br />
Tributary<br />
Indus<br />
Tributary<br />
KPK - 121 2012<br />
KPK - 130 2012<br />
4. JInnah Hydropower Indus Punjab - 96 2012<br />
5. Neelum-Jhelum<br />
Hdroelectric<br />
Neelum AJK - 969 2015<br />
6. Golen Gol Chitral KPK - 106 2015<br />
7. Diamer Basha Indus GB 8.1 4500 2020<br />
8. Tarbela 4th Ext. Indus KPK - 1450 2015<br />
9. Kurram Tangi Kurram FATA/KPK 1.20 84 2015<br />
10. Kohala Jhelum AJK - 1100 2018<br />
11. Dasu Indus KPK - 4320 2027<br />
12. Bunji Indus GB - 7100 2023<br />
13. Munda Swat FATA/KPK 1.290 740 2018<br />
14.<br />
Treatment of Saline<br />
Effluent – RBOD<br />
Sindh - -