CHASHMA RIGHT BANK CANAL PROJECT (LIFT-CUM-GRAVITY)<br />
1. LOCATION The proposed project is located on the right bank<br />
of Indus River in D.I. Khan District of NWFP.<br />
2. SALIENT FEATURES<br />
INTAKE Off takes from Head Race Channel<br />
of Chashma Hydropower Plant.<br />
FEEDER CANAL<br />
Capacity 2613 Cusecs<br />
Length 39 Miles<br />
F.S.L (at RD 04+000) 638.64 Ft<br />
Bed Level (at RD 404+000) 624.03 Ft<br />
PUMPING STATION<br />
Capacity 2533 Cusecs<br />
Lift 64 ft.<br />
Pumping Units 8 units<br />
Capacity 6 No of 353 cusecs each<br />
2 No of 212 cusecs each<br />
Type Vertical mixed flow pump<br />
MAIN CANAL (GRAVITY)<br />
Capacity 2533 Cusecs<br />
Length 73 Miles<br />
Command Area 286100 Acres<br />
F.S.L (at RD 0+000) 685.75 Ft<br />
Bed Level (at RD 0+000) 670.46 Ft<br />
DISTRIBUTARIES<br />
No. of Distributaries 25 Nos.<br />
Length 167 Miles<br />
Length of Minors 102 Miles<br />
PROJECT COST Rs. 61.066 Billion<br />
3. CURRENT STATUS<br />
Detailed Engineering & Tender Documents completed on Feb. 29, 2004 by M/s. NDC Joint Venture.<br />
PC-I (Rs.25.399 Billion) submitted to GOP/GONWFP for approval on July 31, 2004. Discussed in<br />
CDWP meeting held on 7.3.2005.<br />
PC-I amounting to Rs. 61.087 billion cleared in principle by CDWP in its meeting held on March 18,<br />
2010 for approval of ECNEC.<br />
A committee under Chairmanship of Deputy Chairman, Planning Commission was constituted to<br />
deliberate on the issues relating financing, engineering and economics of the Project.