LOCATION<br />
KEYAL KHWAR HYDROPOWER PROJECT<br />
The project is located in the North-West Frontier Province<br />
(NWFP) of Pakistan on Keyal Khwar in Kohistan District.<br />
The project is accessible by road and is at a distance of 310<br />
km from Islamabad. Keyal Khwar is the right bank tributary of<br />
Indus River.<br />
SALIENT FEATURES<br />
Installed Capacity (MW) 122 MW<br />
Type of Dam Concrete gravity<br />
Gross Head 732 m<br />
Height of Dam 42.5 m<br />
Design Discharge 22 m 3 /sec<br />
Mean Annual Energy 426 GWh<br />
Estimated Project Cost Euro 180 Million<br />
No. & Type of Turbine 2, Pelton<br />
EIRR 15.50%<br />
BACKGROUND/ PRESENT STATUS<br />
Feasibility Report completed in October, 2007.<br />
Loan Project Agreement Euro 79 Million between GOP and KfW of Germany signed on November<br />
11, 2008 for implementation of the Project. Supplementary Loan Agreement Euro 20 Million signed<br />
on 11-04-2009.<br />
The Consultant JV comprising M/s Lahmeyer Germany as Lead Firm in association with M/s NDC<br />
and EASE PAK have been engaged for conducting Detailed Engineering Design and preparation<br />
of Tender Documents.<br />
Detailed Engineering Design has been completed.<br />
Tender Documents for Ventilation Tunnel has been finalized by Consultant and <strong>WAPDA</strong>. After<br />
receiving NOC from Kfw, Bid for Ventilation Tunnel, the lowest bidder M/s Sarwar & Co. submitted<br />
the acceptance letter and performance security.<br />
Consent of Kfw is awaited for signing the contract.