TREATMENT OF EFFLUENT WATER OF RBOD<br />
(PILOT PROJECT)<br />
• <strong>WAPDA</strong> in line with the directives of the President of Pakistan in October 2009, engaged<br />
M/s EASE-PAK Consultants to carryout the detailed feasibility study with a completion period<br />
of six months.<br />
• The Consultants have submitted the draft feasibility study which is under review with<br />
<strong>WAPDA</strong>.<br />
• The initial findings are:<br />
• The project is technically feasible, economically viable and environment friendly.<br />
• In-situ analysis of effluent through Prototype plant is planned to authenticate the exact<br />
quantity of recoverable salts.<br />
• The Prototype laboratory plant has been shifted from USA and is functioning on Site<br />
since 15th May, 2010.<br />
• The RBOD effluent must be used as such or after treatment for drinking, agriculture,<br />
fishery or other economical uses.<br />
• The excess quantity of Parameters like calcium carbonate, magnesium make effluent<br />
harder which is hazardous for irrigation. After Treatment, excess quantity of calcium<br />
carbonate and magnesium shall be removed.<br />
FLOWS AND QUALITY IN RBOD (RD + 93 MNV DRAIN)<br />
SEASON FLOWS (cfs)<br />
Total Dissolved Solids<br />
(PPM)<br />
Sodium Adsorption<br />
Ratio (SAR)<br />
Residual sodium<br />
Carbonate (RSC)<br />
Kharif 1145 690 – 1900 6-9 0<br />
Rabi 198 1910 – 8360 7-16 0<br />
Useable Flows = 28% (376 cfs)<br />
Marginal Flows = 23% (309 cfs)<br />
Hazardous Flows = 49% (658 cfs)<br />
Treatment Plants to be Installed = 5 Nos. (40 cfs each)<br />
Benefits of Pilot Project<br />
• 40 cfs of water after treatment will irrigate upto 10,000 acres of barren land<br />
• Project Base Cost. = Rs.3891 M<br />
• Project Revenues (Annual) = Rs. 644 M<br />
• Project O&M Cost (Annual) = Rs. 237 M<br />
• Project Life = 30 years<br />
• Benefit Cost Ratio = 1.18:1<br />
• EIRR = 15.06 %<br />
Total Project:<br />
• Total additional water available after treatment 985,000 AF<br />
• Additional area to be irrigated 350,000 Acres<br />
• Net annual benefits (Revenue) Rs13.227 Billion<br />
• Cost of one plant of 40 cfs (Pilot Project) Rs2 Billion/US$ 24 Million<br />
• Cost of five plants of 40 cfs each Rs10 Billion/US 120 Million<br />
This project is submitted for the US Assistance under FODP for 05 Plants of 40 cfs<br />
for treatment of effluent water for drinking, agriculture, fishing and other<br />