TARBELA 4TH EXTENSION PROJECT<br />
LOCATION Tarbela Dam<br />
Existing Installed Capacity 3478 MW<br />
This project will play significant and sustainable expansion in<br />
Pakistan’s hydropower generation by installing about 1410<br />
MW hydropower plant on the already existing Tunnel 4 of<br />
Tarbela Dam, thus reducing exposure to many social and<br />
environmental challenges generally associated with large dams<br />
projects. The project is considered a low hanging fruit and it is a<br />
“low-risk- high reward” operation aimed at providing over 3,84 billion units annually of least-cost<br />
low-carbon renewable energy. The expected saving of Foreign Exchange US$ 900 Million on import of<br />
one million tons of furnace oil for equivalent generation of electricity from Thermal resources.<br />
SALIENT FEATURES<br />
Tunnel-4 (Already constructed)<br />
• Purpose Irrigation<br />
• Type Concrete/Steel Lined<br />
• Diameter 45 ft to 36 ft<br />
• Length 2997 ft<br />
Dam (Already constructed)<br />
• Height 485 ft (147.82 m)<br />
• Length 9000 ft (27434 m)<br />
Spillway (Already constructed)<br />
• 4 th Extension estimated<br />
Installed Capacity 1410 MW<br />
• Estimated Project Cost US$ 935 Million<br />
PRESENT STATUS<br />
The revised PC-II of the subject project stands approved by Central Development Working Party<br />
(CDWP) on 08.06.2010.<br />
Contract Agreement duly approved by World Bank signed on 10 th June 2010 with JV of Mott MacDonald –<br />
UK and Coyne et Billier – France now called as the “Tarbela 4 Consultants JV”.<br />
Final Design Report incorporating decisions of 3rd POEs Meeting received from Consultants on 20.12.2011<br />
(Numerical Model Studies Report expected soon)<br />
Draft Tender Documents (E&M) received from Consultants on 20.12.2011 being reviewed by <strong>WAPDA</strong>.<br />
PQ Docs incorporating WB / <strong>WAPDA</strong> comments received from Consultants on 04 Jan 2012 are being vetted<br />
Consultants Proposal for conversion of T5 for Power Generation pending with World Bank for clearance<br />
TORs for M&E Consultants prepared by Consultants, vetted by <strong>WAPDA</strong> are with World Bank for clearance<br />
/ NOL.<br />
TORs for Social & Environmental Experts and Grievance Redressal Cell (GRC) are under scrutiny of CCC.<br />
TORs for enhancement of power from GBHP after clearance from <strong>WAPDA</strong> and World Bank are with<br />
Consultants for submittal of proposal.<br />
Agenda for negotiations of Assignment B (Construction Supervision) to be held with the Consultants by the<br />
Standing Committee for Financial Proposals (SCFP) prepared and sent to GM (P&D) / Convener (SCFP) for<br />
clearance prior to its transmittal to the Consultants.<br />
World Bank is financing the design work at a cost of US $ 5.5 Million whereas the finances to the tune of US<br />
$ 908 Million would be required for implementation / construction of the project. World Bank is inclined to<br />
provide the financing for this project.