LOCATION<br />
BUNJI HYDROPOWER PROJECT<br />
The project is located on Indus River near Gilgit.<br />
Power House and Dam sites are 560 km &<br />
610 km, respectively from Islamabad.<br />
SALIENT FEATURES<br />
Installed Capacity 7100 MW<br />
Gross Height 445 m<br />
Design Discharge 1900 m 3 /sec<br />
Mean Annual Energy 24088 GWh<br />
No. & Type of Turbine 20 (Francis)<br />
Type of Dam Gravity RCC<br />
Height of Dam 190 m<br />
Headrace Tunnels 5 No (7.8 km long)<br />
Estimated Project Cost US$ 6.8 Billion<br />
Estimated construction period 9 Years<br />
BACK GROUND/CURRENT STATUS<br />
<strong>WAPDA</strong> completed the Pre-Feasibility report in March 2005.<br />
Consultancy Contract Agreement signed on 25.4.2007 for Feasibility study, Detailed<br />
Engineering design and preparation of tender document with a joint Venter of M/s Mott<br />
MacDonald Ltd, U.K (Lead Partner), M/s Sogreah Consultants SAS, France, M/s<br />
Nippon Koei Co. Ltd., Japan, M/s MM Pakistan (Pvt) Ltd, Pakistan and M/s DMC,<br />
Pakistan<br />
Feasibility report was submitted by the Consultants in March 2009.<br />
Draft Detailed Design and Draft Tender Documents of different lots has been submitted<br />
by the Consultants.<br />
As the project is located in a very complex geological formation field investigations are<br />
required to be continued for updation of information and finalization of detailed design<br />
which will take about 24 months.<br />
Consultancy agreement has been extended till September 2012.<br />
Final Report is expected to be finalized and issue till August 2012.<br />
Transmission Scheme for Dispersal of Power from Bunji Hydropower Project to<br />
Major Load Centers in the National Grid – Estimated Cost of US$ 1.6 billion.<br />
35 - 50<br />
35 - 45<br />
35 - 40<br />
PARRI<br />
GILGIT RIVER<br />
74 - 35 74 - 40 74 - 45 74 - 50<br />
Alam Bridge<br />
SAI NALA<br />
R. Pindi 560 km Gilgit 50 km Skardu Road<br />
INDUS RIVER<br />
MANOT BARMAS<br />
JAGLOT<br />
BARGIN<br />
DAMOT<br />
KKH<br />
HANUCHAL<br />
ACHHU<br />
GILGLE<br />
BURI GERI<br />
SHUTA<br />
Partab Bridge<br />
BUNJI<br />
1.7 km<br />
Tailrace<br />
BUNJI Bridge<br />
HOS DAS<br />
Pressure Tunnels (6.3 km each)<br />
INDUS RIVER<br />
SASSI<br />
HURBAN<br />
SHAH BTOT<br />
SKARDU ROAD<br />
INDUS RIVER<br />
BURCH<br />
SARKUND<br />
MIAR DAS<br />
CHRUKO NALLAH<br />
SUMARI<br />
GILGIT 83 km<br />
SKARDU 140 km<br />
INDUS RIVER<br />
MOUSKEN NALLAH<br />
BUNJI HYDROPOWER PROJECT<br />
PROJECT LAYOUT<br />
KHAND JATORIKOI MRANGMAL<br />
SHENGUS<br />
PAHARI GHUND<br />
BALACHI<br />
TULCH<br />
KISNARDAR<br />
JAWARI<br />
JUCHI<br />
0.00<br />
Yellbow/Yulbo<br />
1 km<br />
2 km<br />
3 km<br />
SCALE<br />
Jun Nala<br />
4 km<br />
5 km<br />
6 km<br />
7 km<br />
7.5 km