MCset 4 - 24 kV - engineering site - Schneider Electric
MCset 4 - 24 kV - engineering site - Schneider Electric
MCset 4 - 24 kV - engineering site - Schneider Electric
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
2 - 07897542EN indice: D0<br />
Contents<br />
Access to the interior of the cubicle 33<br />
AD4 - RD4 cubicle 33<br />
CL4 cubicle (bus-section) 34<br />
CL4 cubicle (bus-section) with upstream CT’s 35<br />
GL4 cubicle (bus-riser) 36<br />
TT4 cubicle 37<br />
DI4 cubicle 38<br />
AD4 cubicle incoming from the top (RHC) 39<br />
Installation instructions 40<br />
Preparation of the cubicle to the positioning 40<br />
Adjusting cubicles on standard civil <strong>engineering</strong> works 4<br />
Fastening to the floor on standard civil <strong>engineering</strong> works 4<br />
Fastening to the floor on earthquake resistant civil<br />
<strong>engineering</strong> works 42<br />
Verify correct positioning 42<br />
Assembly tunnel 43<br />
Cubicle coupling 47<br />
Connection of earthing busbar 54<br />
End panels assembling 55<br />
Fitting the main busbars 60<br />
250A main busbars 6<br />
2000 / 2500A main busbars 62<br />
Fitting joint covers 63<br />
Positioning the joint covers 65<br />
Connection of the LV cables 66<br />
LV cable connections 66<br />
Closing the top entry LV cable steel sheet. 67<br />
Earthing circuit equipotential connection and<br />
MV cable earthing 68<br />
Starting conditions 68<br />
Equipotential connection of the switchboard’s earth to<br />
the substation earth 68<br />
Connection of MV cables 69<br />
One single core or three-core cable per phase 69<br />
to 4 single core cables per phase 70<br />
Three-core cable per phase 70<br />
Anchoring supports for MV cables 7<br />
Earthing of MV cable shields 72<br />
Earthing of MV cable shields (DI4) 72<br />
Final operations 73<br />
Fitting fuses in DI4 cubicle 74<br />
<strong>Schneider</strong> <strong>Electric</strong>