Voltage test on the main<br />
circuits<br />
How to prepare the units<br />
Operations to be carried out on<br />
units not directly connected to<br />
the testing equipment<br />
76 - 07897542EN indice: D0<br />
Tests on <strong>site</strong><br />
After erection, the equipment shall be tested<br />
in order to check the correct installation.<br />
The power-frequency test voltage shall be<br />
80% of the rated test value (40<strong>kV</strong> rms),<br />
because the units have already been tested<br />
in <strong>Schneider</strong> <strong>Electric</strong> factory at 00% of the<br />
voltage rated value) and shall be applied<br />
to each phase conductor of the main circuit<br />
for minute earthing the other two phase<br />
conductors.<br />
The leads from the testing equipment shall<br />
be connected to the MV cable lugs of a unit.<br />
This requires the opening of a lower door<br />
during the test for passing the<br />
above-mentioned leads.<br />
For a complete description of the following<br />
operations, please consult the SF<br />
circuit-breaker instruction for use handbook.<br />
Warning<br />
This preparation entails the bypass of some<br />
interlock. Only appropriately trained staff<br />
shall be allowed to operate.<br />
The procedures described in the following<br />
shall be strictly applied.<br />
Voltage transformers and lightening<br />
arresters, if any, shall be disconnected<br />
during the voltage tests at power frequency<br />
in order to avoid severe damages.<br />
NB: In units equipped with VTs withdrawable<br />
fuse version, disconnect the fuses. In units<br />
equipped with fixed VTs, disconnect the VTs<br />
power supply primary circuit.<br />
CTs secondaries shall be short-circuited<br />
at the LV terminal boards (if the auxiliary<br />
circuits are open).<br />
During the voltage tests, all the unit shall be<br />
fitted with the relevant circuit-breakers.<br />
The circuit-breakers shall be plugged in<br />
service position and closed.<br />
Since hand closing is not permitted with<br />
closed doors, a special procedure is<br />
required (see below) when auxiliary power<br />
supply is not available.<br />
Obviously, the MV cables shall be<br />
disconnected and the earthing switch shall<br />
be opened.<br />
- Circuit-breaker in disconnected position<br />
and the compartment door open.<br />
- Lift the locking rod A located on the top of<br />
the circuit-breaker mechanism.<br />
- Insert spacer U to keep the rod in raised<br />
position.<br />
- Push the circuit-breaker to the service<br />
position and remove spacer U.<br />
- Charge the closing spring of the<br />
circuit-breaker and close it by pressing<br />
pushbutton “ I ”.<br />
<strong>Schneider</strong> <strong>Electric</strong>