manpower. Narrative explanations of each resource constraint and an impact statement<br />

describing what effect each constraint has on training are included. Also included in this section<br />

are actions required, OPR, and target completion dates. Resource constraints will be, as a<br />

minimum, reviewed and updated annually.<br />

12. Apprentice Level Training.<br />

12.1. Constraints. The A-10, F-15 and F-16 courses have additional equipment requirements.<br />

The new RPA course will require instructor manning, student man-years, and equipment.<br />

12.1.1. Impact. The fighter courses will be implemented as scheduled but may have training<br />

deficiencies if required equipment is not delivered on schedule. The RPA course will not be<br />

implemented until instructor manning and student man-years are authorized. The course may be<br />

implemented before all equipment is available but students may graduate early without all<br />

requested training.<br />

12.1.2. Resources Required. The A-10 course needs a CBU-103. The F-15 needs a UPLA.<br />

The F-16 course needs 2 BRU-61 WLT, CMBRE, ADU-890 and a GBU-10. The RPA course<br />

needs: 1 instructor, 2 student man-years, 1 MQ-9, 3 BRU-15, 1 A/N-AWM 101A Tester, 3 MA-<br />

4B Bomb Racks, 1 mid-station pylon, 1 inboard pylon, 1 M299 Launcher, 1 GBU-12, and 1<br />

GBU-38.<br />

12.1.3. Action Required. Schoolhouse will submit out-of-cycle requests for the additional<br />

munitions and submit appropriate requisition documents through supply for the identified<br />

equipment items. Various OPRs are identified within the action items for actual acquisition of<br />

the equipment items. Additionally, formal Course Resource Estimates (CRE) will be submitted<br />

through HQ AETC.<br />

12.2. OPR and Target Completion Date. The schoolhouse Training Manager and the AETC<br />

Training Pipeline Manager are responsible for tracking open action items from the U&TW.<br />

Updates are posted quarterly on the Armament SharePoint.<br />

13. Five Level Training. No resource constraints.<br />

14. Seven Level Training. No resource constraints<br />

Section E - Transitional Training Guide<br />

Note: There is currently no transition training requirements. This area is reserved.<br />

Part II<br />

Section A – Specialty Training Standard (STS)<br />

15. Implementation. The <strong>2W1X1</strong> STS will be maintained within TBA. AETC will begin<br />

using this STS for technical training for 3-level classes beginning February 2012 and 7-level<br />

classes beginning Apr 2012.<br />