05.04.2013 Views

AFSC 2W1X1 AIRCRAFT ARMAMENT SYSTEMS ... - Air Force Link

AFSC 2W1X1 AIRCRAFT ARMAMENT SYSTEMS ... - Air Force Link

AFSC 2W1X1 AIRCRAFT ARMAMENT SYSTEMS ... - Air Force Link

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

B-1 <strong>Air</strong>craft<br />

1. Tasks 2. Core 3. Certification for OJT<br />

Tasks<br />

4. Proficiency Codes Used To Indicate<br />

Training/Information Provided<br />

Knowledge And Technical References A B A B C D E A B<br />

C<br />

5<br />

Level<br />

3-Skill Level 5-Skill Level 7-Skill Level<br />

7 Tng Start Tng Done Trainee<br />

Level Initials<br />

Trainer<br />

Initials<br />

Certifier<br />

Initials<br />

(1) (2) (1) (2) (1) (2)<br />

Crse CDC Crse CDC Crse CDC<br />

* 4.3.2 Theory of Operation A - - - - -<br />

* 4.3.3 Function of Parts A - - - - -<br />

4.3.4 Sniper Pylon<br />

TR: TO 1-1b-2-94JG-30-11, 16-W6-<br />

30-3<br />

4.3.4.1 Remove - - - - - -<br />

4.3.4.2 Inspect - - - - - -<br />

4.3.4.3 Repair - - - - - -<br />

4.3.4.4 Install - - - - - -<br />

4.3.5 Conventional Rotary Launcher<br />

(LAU-144/A -180 Inch)<br />

* 4.3.5.1 Remove from <strong>Air</strong>craft 1b - - - - -<br />

* 4.3.5.2 Disassemble 1b - - - - -<br />

* 4.3.5.3 Inspect 1b - - - - -<br />

4.3.5.4 Repair - - - - - -<br />

* 4.3.5.5 Assemble 1b - - - - -<br />

* 4.3.5.6 Install on <strong>Air</strong>craft 1b - - - - -<br />

* 4.3.5.7 Perform Functional Check<br />

with 750 Test Set<br />

1b - - - - -<br />

* 4.3.5.8 Perform End of Firing Day<br />

Inspection<br />

3b - - - - -<br />

* 4.3.5.9 Perform Rotary Launcher<br />

Weapons/Bay Status Check<br />

1b - - - - -<br />

4.3.5.10 Perform 60-Day Flush - - - - - -<br />

4.3.5.11 Hoist with Consolidated Sling<br />

Assembly<br />

- - - - - -<br />

4.3.6 Conventional Bomb Module<br />

* 4.3.6.1 Remove from <strong>Air</strong>craft 1b - - - - -<br />

* 4.3.6.2 Disassemble 1b - - - - -<br />

* 4.3.6.3 Inspect 1b - - - - -<br />

4.3.6.4 Repair - - - - - -<br />

* 4.3.6.5 Assemble 1b - - - - -<br />

* 4.3.6.6 Install on <strong>Air</strong>craft 1b - - - - -<br />

* 4.3.6.7 Perform Functional Check<br />

with 750 Test Set<br />

1b - - - - -<br />

* 4.3.6.8 Perform End of Firing Day<br />

Inspection<br />

3b - - - - -<br />

* 4.3.6.9 Perform Bomb Module<br />

Weapons/Bay Status Check<br />

1b - - - - -<br />

4.3.6.10 Perform 60 Day Flush - - - - - -<br />

4.3.6.11 Hoist with Consolidated Sling<br />

Assembly<br />

- - - - - -<br />

4.3.7 MAU-12<br />

4.3.7.1 Remove - - - - - -<br />

4.3.7.2 Disassemble - - - - - -<br />

4.3.7.3 Inspect - - - - - -<br />

4.3.7.4 Repair - - - - - -<br />

4.3.7.5 Assemble - - - - - -<br />

4.3.7.6 Install - - - - - -<br />

4.3.7.7 Perform Bench Check with<br />

MAU-12/40/50<br />

- - - - - -<br />

49 1 January 2012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!