05.04.2013 Views

AFSC 2W1X1 AIRCRAFT ARMAMENT SYSTEMS ... - Air Force Link

AFSC 2W1X1 AIRCRAFT ARMAMENT SYSTEMS ... - Air Force Link

AFSC 2W1X1 AIRCRAFT ARMAMENT SYSTEMS ... - Air Force Link

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

B-52H <strong>Air</strong>craft<br />

1. Tasks 2. Core Tasks 3. Certification for OJT 4. Proficiency Codes Used To Indicate<br />

Training/Information Provided<br />

Knowledge and Technical References A B A B<br />

5 Level 7 Level Tng Start Tng Done<br />

C<br />

Trainee<br />

D<br />

Trainer<br />

E A B C<br />

3-Skill Level 5-Skill Level 7-Skill Level<br />

Certifier (1) (2) (1) (2) (1) (2)<br />

Initials Initials Initials Crse CDC Crse CDC Crse CDC<br />

6.3.5.4 Repair - - - - - -<br />

6.3.5.5 Assemble - - - - - -<br />

6.3.5.6 Install - - - - - -<br />

6.3.6 Cluster Bomb Rack<br />

TR: TOs 1B-52H-2-31JG Series,<br />

11B29-3-21-2, 11B38-2-5-1<br />

* 6.3.6.1 Remove 2b - - - - -<br />

* 6.3.6.2 Inspect 2b - - - - -<br />

* 6.3.6.3 Install 2b - - - - -<br />

6.3.7 A-6 Bomb Release Unit<br />

TR: TOs 11B29-3-21-2, 11B38-2-<br />

5-1<br />

* 6.3.7.1 Remove 3b - - - - -<br />

* 6.3.7.2 Inspect 3b - - - - -<br />

* 6.3.7.3 Install 3b - - - - -<br />

6.3.8 B-11 Bomb Shackle<br />

TR: TO 11B40-2-4-3<br />

* 6.3.8.1 Disassemble 2b - - - - -<br />

* 6.3.8.2 Inspect 2b - - - - -<br />

* 6.3.8.3 Assemble 2b - - - - -<br />

6.3.9 CSRL Yokes<br />

TR: TOs 1B-52H-2-31JG-Series,<br />

11B29-3-52-2<br />

* 6.3.9.1 Remove 2b - - - - -<br />

6.3.9.2 Disassemble - - - - - -<br />

* 6.3.9.3 Inspect 1b - - - - -<br />

6.3.9.4 Repair - - - - - -<br />

6.3.9.5 Assemble - - - - - -<br />

* 6.3.9.6 Install 2b - - - - -<br />

6.3.9.7 Hydraulic Power Supply<br />

TR: 33D2-5-81-1<br />

6.3.9.7.1 Inspect - - - - - -<br />

6.3.9.7.2 Operate - - - - - -<br />

6.3.9.7.3 Maintain - - - - - -<br />

6.3.9.8 PDU to/from Yoke<br />

Assembly<br />

TR: 11B29-3-52-2<br />

6.3.9.8.1 Remove - - - - - -<br />

6.3.9.8.2 Inspect - - - - - -<br />

6.3.9.8.3 Install - - - - - -<br />

6.3.10 CSRL (Empty)<br />

TR: TOs 1B-52H-2-31JG-Series,<br />

1B-52H-16, 11B29-3-25-2<br />

* 6.3.10.1 Remove 1b - - - - -<br />

6.3.10.2 Inspect - - - - -<br />

* 6.3.10.3 Install 1b - - - - -<br />

6.3.11 MAU-12<br />

TR: TOs 1B-52H-2-31JG-Series,<br />

11B29-3-25-2, 16W6-47-2, 35D5-<br />

53-13-1<br />

* 6.3.11.1 Remove from Heavy Stores<br />

Adapter Beam<br />

2b - - - - -<br />

* 6.3.11.2 Disassemble B 2b - - - - -<br />

* 6.3.11.3 Inspect B 2b - - - - -<br />

64 1 January 2012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!