28.04.2013 Views

pellets boiler - Paul Künzel GmbH & Co.

pellets boiler - Paul Künzel GmbH & Co.

pellets boiler - Paul Künzel GmbH & Co.

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Abbildung 9: Plan of connections for PL with ext. conveyor screw for 240V motor<br />

Important: For 400 volt three–phase motors, the KUENZEL motor connection set of the type no.<br />

100052 is recommended. If the motor connection has already been fitted, it is advisable to use the corresponding<br />

motor protection–switch.<br />

Attention: Take care that there evolves no vaccum in the pellet bin when the external pellet storage<br />

is beeing filled. You can avoid this by simply opening the flap of the pellet bin. Before having the external<br />

storage room filled switch off the KUENZEL pellet <strong>boiler</strong>. To do this, press the START/STOP<br />

button to produce a burn–out and make sure there are no glowing or burning <strong>pellets</strong> left in the fire<br />

pan or on the ash–tray. Filling up the external storage room must take place under observation<br />

only!<br />

1.15 Fixing the Pellet Storage Bin<br />

For safety reasons, the lid of the pellet bin must always be kept closed during operation . If the flap<br />

opens, the conveyor screw will stop and the caution symbol on the control panel will light up. If the flap<br />

is closed again, the lighted symbol will disappear and operation will resume.<br />

Please always be aware that the the pellet bin lid closes well. If the locking screw is getting loose, it must<br />

be tightened again.<br />

1.16 PL 25<br />

If you have a PL25 <strong>boiler</strong>, please check if all 14 of the turbo– gratings are hanging correctly in place in<br />

the heat exchanger before starting it for the first time.<br />

12

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!