pellets boiler - Paul Künzel GmbH & Co.
pellets boiler - Paul Künzel GmbH & Co.
pellets boiler - Paul Künzel GmbH & Co.
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Abbildung 9: Plan of connections for PL with ext. conveyor screw for 240V motor<br />
Important: For 400 volt three–phase motors, the KUENZEL motor connection set of the type no.<br />
100052 is recommended. If the motor connection has already been fitted, it is advisable to use the corresponding<br />
motor protection–switch.<br />
Attention: Take care that there evolves no vaccum in the pellet bin when the external pellet storage<br />
is beeing filled. You can avoid this by simply opening the flap of the pellet bin. Before having the external<br />
storage room filled switch off the KUENZEL pellet <strong>boiler</strong>. To do this, press the START/STOP<br />
button to produce a burn–out and make sure there are no glowing or burning <strong>pellets</strong> left in the fire<br />
pan or on the ash–tray. Filling up the external storage room must take place under observation<br />
only!<br />
1.15 Fixing the Pellet Storage Bin<br />
For safety reasons, the lid of the pellet bin must always be kept closed during operation . If the flap<br />
opens, the conveyor screw will stop and the caution symbol on the control panel will light up. If the flap<br />
is closed again, the lighted symbol will disappear and operation will resume.<br />
Please always be aware that the the pellet bin lid closes well. If the locking screw is getting loose, it must<br />
be tightened again.<br />
1.16 PL 25<br />
If you have a PL25 <strong>boiler</strong>, please check if all 14 of the turbo– gratings are hanging correctly in place in<br />
the heat exchanger before starting it for the first time.<br />
12