28.04.2013 Views

pellets boiler - Paul Künzel GmbH & Co.

pellets boiler - Paul Künzel GmbH & Co.

pellets boiler - Paul Künzel GmbH & Co.

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

The minimum <strong>boiler</strong> temperature delimination of the heating electronics must be set to 60o C; the burner–<br />

switch difference to 15oC. Please also read the heating electronics instructions for this.<br />

Before installing the system, please read the operation and assembly instructions of all appliances. Make<br />

sure that the sensors of the <strong>boiler</strong> control panel do not get mixed up with those of the heating electronics.<br />

The wiring of the installation must only be carried out by a qualified electrician; PVC cables must not be<br />

fitted into the <strong>boiler</strong>.<br />

Pay attention to the state of the sacrificial anode in the hot water tank as faulty anodes can lead to<br />

premature damage of the <strong>boiler</strong>. We recommend that the anode should be checked at least once a year.<br />

The electric connection is made after the electro–plan for the system package PL3.<br />

3.3.1 Hydraulic–Plan<br />

3.3.2 Electro–Plan<br />

Abbildung 32: System Package PL3<br />

Abbildung 33: Electro–plan for system package PL3<br />

30

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!