pellets boiler - Paul Künzel GmbH & Co.
pellets boiler - Paul Künzel GmbH & Co.
pellets boiler - Paul Künzel GmbH & Co.
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
3.1.2 Electro–Plan<br />
Abbildung 29: Electro–plan to the package PL1<br />
3.2 Package PL2 for Pellet Boilers with Hot Water Tank and Buffer Storage<br />
This suggestion for a pellet <strong>boiler</strong> heating system according tosystem–package PL2 shows how to build<br />
an uncomplicated, economical and small pellet heating installation with regulated hot water tank and<br />
buffer storage. With this system, a 4–way mixer as <strong>boiler</strong> back–end protection is not enough. It should,<br />
therefore, be provided with a Thermomix Valve.<br />
Make sure that the <strong>boiler</strong> circulation pump (15) and the heating circuit pump (18) match up with each<br />
other correctly. Please also read the section „Fitting the <strong>boiler</strong> back–end protection“ in our technical<br />
material for this.<br />
We recommend that the Thermomix–Valve and the buffer storage are installed in such a way that they<br />
can be blocked on all sides so that an easier service is possible.<br />
The minimum <strong>boiler</strong> temperature delimination of the heating electronics must be set to 60o C; the burner–<br />
switch difference to 15oC. Please read the heating electronics instructions to do this.<br />
Before installing the system, please read the operation and assembly instructions of all appliances to<br />
make sure that the <strong>boiler</strong> control panel sensors do not become mixed up with those of the heating electronics.<br />
The wiring of the system must only be carried out by an electrician; PVC cables must not be<br />
used in the <strong>boiler</strong>.<br />
The electro–connection is made after the electro–plan to the system package PL2.<br />
28