28.04.2013 Views

pellets boiler - Paul Künzel GmbH & Co.

pellets boiler - Paul Künzel GmbH & Co.

pellets boiler - Paul Künzel GmbH & Co.

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

6. Fuse box<br />

7. Downpipe for the <strong>pellets</strong><br />

8. Burner pipe<br />

9. Main pipe for the fuse cable<br />

Abbildung 12: Pellet <strong>boiler</strong><br />

Abbildung 13: Overview of the PL15 mechanism<br />

If the <strong>boiler</strong> has been fully connected to the heating system with both water and electricity supplies, the<br />

PL can be operated.<br />

At first, the pellet bin must be filled up. The filling is done by hand. We recommend that the bin should<br />

always be filled up to the top to ensure a good, long operation.<br />

The filling up of the pellet storage bin can also be done automatically with the aid of an optional external<br />

feeding facility. Further information about his can be found in our material.<br />

Important: The KUENZEL pellet <strong>boiler</strong> is equipped with an automatic fire pan ash–emptier. The ash–<br />

emptying cycle is introduced after each burn–out. If there’s no burn–out for a certain amount of time, the<br />

14

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!