Figure 2.8 Road condition.<br />

!" # $ $ $%&<br />

,, 3 $ 0 4 $<br />

Figure 2.9 shows the main technical characteristics of the core railway network.<br />

Around half of the sections on Corridor X, together with a section on Corridor<br />

Vc (Jelina - Grapska in Bosnia and Herzegovina), have today a double track<br />

line and maximum speed 100-160 km/h.<br />

All other existing lines are single track lines. In Table 2.3 the main characteristics<br />

of the rail network are summarised. It appears that:<br />